Difference between revisions of "Fall 2017 Commissioning Plan"
From HallCWiki
Jump to navigationJump to searchLine 5: | Line 5: | ||
| Comment | | Comment | ||
|- | |- | ||
− | | Harp | + | | Harp Scans, BPM and Raster Checkout |
| M. Jones | | M. Jones | ||
| | | | ||
|- | |- | ||
− | | HMS & SHMS | + | | HMS & SHMS Hodoscope Checkout |
| S. Malace | | S. Malace | ||
| | | | ||
|- | |- | ||
− | | SHMS | + | | SHMS Quartz Plane |
| S. Malace | | S. Malace | ||
| | | | ||
|- | |- | ||
− | | HMS & SHMS DC | + | | HMS & SHMS DC Checkout, Tracking Efficiency and Alignment |
| H. Szumila-Vance, C. Yero | | H. Szumila-Vance, C. Yero | ||
| | | | ||
|- | |- | ||
− | | HMS & SHMS | + | | HMS & SHMS Heavy Gas Cherenkov Checkout |
| E. Pooser, R. Ambrose | | E. Pooser, R. Ambrose | ||
| | | | ||
|- | |- | ||
− | | HMS & SHMS | + | | HMS & SHMS Pre-Shower/Shower Checkout |
| H. Mkrtchyan, A. Asaturyan, V. Berdnikov | | H. Mkrtchyan, A. Asaturyan, V. Berdnikov | ||
| | | | ||
|- | |- | ||
− | | SHMS | + | | SHMS Aerogel Checkout |
| H. Mkrtchyan, A. Asaturyan, V. Berdnikov | | H. Mkrtchyan, A. Asaturyan, V. Berdnikov | ||
| | | | ||
|- | |- | ||
− | | HMS & SHMS 3/4 | + | | HMS & SHMS 3/4 Trigger Efficiency Checkout |
| B. Sawatzky, E. Pooser, C. Yero | | B. Sawatzky, E. Pooser, C. Yero | ||
| | | | ||
|- | |- | ||
− | | HMS & SHMS PID | + | | HMS & SHMS PID Trigger Efficiency Checkout |
| B. Sawatzky, E. Pooser, C. Yero | | B. Sawatzky, E. Pooser, C. Yero | ||
| | | | ||
|- | |- | ||
− | | Beam | + | | Beam Energy |
| M. Jones, D. Mack | | M. Jones, D. Mack | ||
| | | | ||
Line 53: | Line 53: | ||
| | | | ||
|- | |- | ||
− | | Carbon | + | | Carbon Elastic with Sieve for Final SHMS Tune Determination |
| M. Jones, H. Szumila-Vance | | M. Jones, H. Szumila-Vance | ||
| | | | ||
|- | |- | ||
− | | Carbon | + | | Carbon Elastic Scan for Delta Matrix Optimization |
| H. Bhatt, D. Dutta | | H. Bhatt, D. Dutta | ||
| | | | ||
|- | |- | ||
− | | Carbon | + | | Carbon Inelastics with Sieve for Ytgt, Y’tgt and X’tgt (Need 20 deg for Ytgt) |
| M. Jones, H. Szumila-Vance | | M. Jones, H. Szumila-Vance | ||
| | | | ||
|- | |- | ||
− | | Sieve | + | | Sieve Check After Cycling SHMS Magnets from Positive to Negative and Back |
| M. Jones | | M. Jones | ||
| | | | ||
|- | |- | ||
− | | Determine SHMS | + | | Determine SHMS Central Momentum and Angle with Set of Elastic ep Data. |
| A. Karki, S. Basnet, D. Dutta | | A. Karki, S. Basnet, D. Dutta | ||
| | | | ||
|- | |- | ||
− | | Inelastic | + | | Inelastic Carbon Xn Measurements with Overlapping Momentum Settings for Acceptance Check. |
| M. Jones, B. Duran | | M. Jones, B. Duran | ||
| | | | ||
|- | |- | ||
− | | GEM | + | | GEM Front Sieve to Better Understand HB. Do Optics with p+ to Check Optics. |
| L. Kabir, D. Dutta | | L. Kabir, D. Dutta | ||
| | | | ||
|- | |- | ||
− | | Coincidence | + | | Coincidence Timing Checkout and Optimization. |
| B. Sawatzky, E. Pooser, C. Yero | | B. Sawatzky, E. Pooser, C. Yero | ||
| | | | ||
|- | |- | ||
− | | Electronic | + | | Electronic Dead Time Checkout |
| B. Sawatzky, E. Pooser, C. Yero | | B. Sawatzky, E. Pooser, C. Yero | ||
| | | | ||
|- | |- | ||
− | | Single Kaon | + | | Single Kaon Production. Coincidence p and K Production. |
| | | | ||
| | | |
Revision as of 15:16, 11 October 2017
Table of Commissioning Tasks
Task | Person | Comment |
Harp Scans, BPM and Raster Checkout | M. Jones | |
HMS & SHMS Hodoscope Checkout | S. Malace | |
SHMS Quartz Plane | S. Malace | |
HMS & SHMS DC Checkout, Tracking Efficiency and Alignment | H. Szumila-Vance, C. Yero | |
HMS & SHMS Heavy Gas Cherenkov Checkout | E. Pooser, R. Ambrose | |
HMS & SHMS Pre-Shower/Shower Checkout | H. Mkrtchyan, A. Asaturyan, V. Berdnikov | |
SHMS Aerogel Checkout | H. Mkrtchyan, A. Asaturyan, V. Berdnikov | |
HMS & SHMS 3/4 Trigger Efficiency Checkout | B. Sawatzky, E. Pooser, C. Yero | |
HMS & SHMS PID Trigger Efficiency Checkout | B. Sawatzky, E. Pooser, C. Yero | |
Beam Energy | M. Jones, D. Mack | |
BCM Calibration | D. Mack, D. Bhetuwal | |
Target Boiling | D. Gaskell | |
Carbon Elastic with Sieve for Final SHMS Tune Determination | M. Jones, H. Szumila-Vance | |
Carbon Elastic Scan for Delta Matrix Optimization | H. Bhatt, D. Dutta | |
Carbon Inelastics with Sieve for Ytgt, Y’tgt and X’tgt (Need 20 deg for Ytgt) | M. Jones, H. Szumila-Vance | |
Sieve Check After Cycling SHMS Magnets from Positive to Negative and Back | M. Jones | |
Determine SHMS Central Momentum and Angle with Set of Elastic ep Data. | A. Karki, S. Basnet, D. Dutta | |
Inelastic Carbon Xn Measurements with Overlapping Momentum Settings for Acceptance Check. | M. Jones, B. Duran | |
GEM Front Sieve to Better Understand HB. Do Optics with p+ to Check Optics. | L. Kabir, D. Dutta | |
Coincidence Timing Checkout and Optimization. | B. Sawatzky, E. Pooser, C. Yero | |
Electronic Dead Time Checkout | B. Sawatzky, E. Pooser, C. Yero | |
Single Kaon Production. Coincidence p and K Production. |
Fall 2017 Commissioning Plan
- The plan will be base on the plan of the full SHMS/HMS commissioning.