== Agenda == | == Agenda == | ||
+ | # [https://hallcweb.jlab.org/DocDB/0009/000904/001/GEM_Mapping_And_Tracking.pdf GEM Mapping and Simple Tracking Algorithm] | ||
#Commissioning plan updates from detector systems | #Commissioning plan updates from detector systems | ||
# Status update from detector owners, calibrations, efficiencies, etc. | # Status update from detector owners, calibrations, efficiencies, etc. | ||
Line 20: | Line 21: | ||
== Minutes == | == Minutes == | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
=== HMS === | === HMS === | ||
− | |||
− | |||
− | |||
− | |||
==== 12 GeV Drift Chambers ==== | ==== 12 GeV Drift Chambers ==== | ||
+ | * Old HMS chambers are out, test stand for 12 GeV chambers are being fit | ||
+ | * Work to map the HMS dipole is tentatively planned | ||
+ | === SHMS === | ||
− | ==== | + | ==== Optics ==== |
− | + | * Holly reported that the mapping is finished for nonlinearities | |
− | + | * HB training is being conducted at 3200 A (80% of 11 GeV maximum) | |
− | + | * Needs to be retrained at higher current, as noted by Mark and Dave | |
− | + | * More work is planned after lunch | |
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
==== GEM ==== | ==== GEM ==== | ||
− | + | * Latif showed [https://hallcweb.jlab.org/DocDB/0009/000904/001/GEM_Mapping_And_Tracking.pdf some slides] | |
− | + | * He is currently working on the mapping for the GEM | |
− | + | * The mapping appears to be working for the most part although more statistics are required in order to populate the x,y position distributions | |
− | + | * Development for determining the x,y position is ongoing | |
− | + | * The mapping corrections are implemented and functional | |
+ | * Algorithm to handled more complicated situations is required | ||
+ | * Correlations between the GEM and DCs has been observed | ||
+ | * It was suggested that the first time bin be utilized for selecting sampling the pedestal | ||
+ | * Focus should be directed on extracting the pulse time from the data so that it can be correlated to the trigger time | ||
+ | * Different function for fitting the charge distribution was suggested by Vlad as opposed to the Landau distribution | ||
+ | * All the data was taken with the SHMS multi crate readout | ||
==== Drift Chambers ==== | ==== Drift Chambers ==== | ||
− | + | * Problematic connector is still has problems | |
+ | * DC3 won’t be used this spring, old chambers will be used for fall and spring | ||
+ | * Howard wants to be pinged if chamber is opened again | ||
==== Hodoscopes ==== | ==== Hodoscopes ==== | ||
− | + | * Simona reported that 11 bars are done, need to be light leak checked | |
− | + | * All should be in the test stand on Saturday | |
− | + | ** Then 4 bars will be made | |
− | + | * Eric reported that the time-walk calibration is 95% complete, although are some discrepancies in the consistency of the fit parameters that are not understood at the moment | |
− | + | * The corrections will need to go into the decode method of the scintillator classes sooner than later | |
==== Aerogel Cerenkov ==== | ==== Aerogel Cerenkov ==== | ||
− | + | * Next week should get spare PMT from CUA, then will need a week to test, install, and check | |
− | + | * HV module was changed and is behaving nominally | |
− |
Latest revision as of 11:48, 18 October 2017
Meeting Information
- Location CC L210A, 11 am
- DocDB
Blue Jeans Connection Information
- https://bluejeans.com/895800575
- Just want to dial in on your phone?
- +1.408.740.7256 (US)
- +1.888.240.2560 (US Toll Free)
- +1.408.317.9253 (Alternate number)
- http://bluejeans.com/numbers
- Enter Meeting ID: 895800575
- Press #
Agenda
- GEM Mapping and Simple Tracking Algorithm
- Commissioning plan updates from detector systems
- Status update from detector owners, calibrations, efficiencies, etc.
- Review systems owners and update information
- Address system specific points of interest for the Fall 2017 run
Minutes
HMS
12 GeV Drift Chambers
- Old HMS chambers are out, test stand for 12 GeV chambers are being fit
- Work to map the HMS dipole is tentatively planned
SHMS
Optics
- Holly reported that the mapping is finished for nonlinearities
- HB training is being conducted at 3200 A (80% of 11 GeV maximum)
- Needs to be retrained at higher current, as noted by Mark and Dave
- More work is planned after lunch
GEM
- Latif showed some slides
- He is currently working on the mapping for the GEM
- The mapping appears to be working for the most part although more statistics are required in order to populate the x,y position distributions
- Development for determining the x,y position is ongoing
- The mapping corrections are implemented and functional
- Algorithm to handled more complicated situations is required
- Correlations between the GEM and DCs has been observed
- It was suggested that the first time bin be utilized for selecting sampling the pedestal
- Focus should be directed on extracting the pulse time from the data so that it can be correlated to the trigger time
- Different function for fitting the charge distribution was suggested by Vlad as opposed to the Landau distribution
- All the data was taken with the SHMS multi crate readout
Drift Chambers
- Problematic connector is still has problems
- DC3 won’t be used this spring, old chambers will be used for fall and spring
- Howard wants to be pinged if chamber is opened again
Hodoscopes
- Simona reported that 11 bars are done, need to be light leak checked
- All should be in the test stand on Saturday
- Then 4 bars will be made
- Eric reported that the time-walk calibration is 95% complete, although are some discrepancies in the consistency of the fit parameters that are not understood at the moment
- The corrections will need to go into the decode method of the scintillator classes sooner than later
Aerogel Cerenkov
- Next week should get spare PMT from CUA, then will need a week to test, install, and check
- HV module was changed and is behaving nominally