== Technical Documents == | == Technical Documents == | ||
+ | * [https://hallcweb.jlab.org/DocDB/0009/000937/003/HGC_Update_17dec.pdf HGC Update - Dec/17 Run] - Preliminary analysis of HGC performance during Dec 2017 commissioning run | ||
+ | * [https://hallcweb.jlab.org/DocDB/0009/000931/002/shms-hgcer-commissioning-plan-2017.pdf HGC Detector Checkout Plan] - Technical document outlining the initial detector checkout plan (primarily gain matching) | ||
* [https://hallcweb.jlab.org/DocDB/0008/000819/001/hgc_calib_plan.pdf HGC Detector Calibration Plan] - Technical document outlining the plan for the initial check-out and calibration steps for the HGC detector for the first year of operation | * [https://hallcweb.jlab.org/DocDB/0008/000819/001/hgc_calib_plan.pdf HGC Detector Calibration Plan] - Technical document outlining the plan for the initial check-out and calibration steps for the HGC detector for the first year of operation | ||
* [https://hallcweb.jlab.org/DocDB/0008/000804/002/report.pdf Simulations for pi/K Separation] - Technical document on projected pi/K separation characteristics from Geant4 simulations when the HGC is filled with Freon | * [https://hallcweb.jlab.org/DocDB/0008/000804/002/report.pdf Simulations for pi/K Separation] - Technical document on projected pi/K separation characteristics from Geant4 simulations when the HGC is filled with Freon |
Latest revision as of 10:59, 19 December 2017
This wiki serves as a reference page outlining useful details regarding the SHMS heavy gas Cherenkov detector
Useful Links
Publications
- 2014 JINST 9 P07012 - Optical characterization of RTV615 silicone rubber compound, W. Li, G.M. Huber
Technical Documents
- HGC Update - Dec/17 Run - Preliminary analysis of HGC performance during Dec 2017 commissioning run
- HGC Detector Checkout Plan - Technical document outlining the initial detector checkout plan (primarily gain matching)
- HGC Detector Calibration Plan - Technical document outlining the plan for the initial check-out and calibration steps for the HGC detector for the first year of operation
- Simulations for pi/K Separation - Technical document on projected pi/K separation characteristics from Geant4 simulations when the HGC is filled with Freon
- Simulations for e/pi Separation - Technical document on projected pi/K separation characteristics from Geant4 simulations when the HGC is filled with CO2
- Mirror Reflectivity Test Results - Technical document detailing UV optical reflectivity characteristics of HGC mirrors
- Performance Testing of HGC PMT's - Technical document outline the performance of the 5 inch PMTs in the HGC readout
- Hamamatsu R1584 PMT Modifications - Technical document outlining modifications made to Hamamatsu bases used in HGC
- Coupling tests for 5" PMT - Technical document outlining coupling of 5" PMTs to Quartz Windows used in HGC
- Final_drawings.tar.gz - Final version of HGC vessel construction drawings, July 2013
Log Book Entries
- HGC PMT Settings Logbook entry from Garth regarding the initial detector checkout
Masters/PhD Theses
- Wenliang Li, M.Sc. Thesis, University of Regina, 2012 - Heavy Gas Cherenkov Detector Construction for Hall C at Thomas Jefferson National Accelerator Facility