(Created page with "= Overview = Topics which are relevant to the DAQ/Trigger for the Spring 2018 commissioning run are discussed here. = DAQ/Trigger Run Plans = = Talks = = Log Book Ent...")
 
Line 2: Line 2:
  
 
Topics which are relevant to the DAQ/Trigger for the Spring 2018 commissioning run are discussed here.
 
Topics which are relevant to the DAQ/Trigger for the Spring 2018 commissioning run are discussed here.
 +
 +
= To-Do =
 +
 +
* High Priority
 +
** Configure Dave G. Dead time measurement scheme (Arrington’s and/or Morhings thesis)
 +
** Configure NGC into SHMS PID trigger leg in place of HGC
 +
** Sanity check SHMS hodoscope CAMAC power supply (noticed unstable behavior during end of fall run)
 +
** Add SHMS PRSHWRSUM in trigger apparatus (FADC leaf)
 +
** Remove layer B from HMS pre-shower sum
 +
 +
* Medium Priority
 +
** Figure out DAC to mV conversion factor, find old talk regarding setting the DAC values to obtain pedestals a pre-determined value
 +
** Include multi-hit capability in the trigger apparatus for reference times
 +
** Integrate TI scalers into report files
 +
** Configure OR of hodoscope trigger logic into TDC’s and scalers
 +
** Change trigger leaf names to PRLO from PRSHWRLO etc. (needs to match xscaler)
 +
 +
* Low Priority
 +
** Add number of FADC error flags to the report files (front and center)
 +
** Add number of pulses identified in the window to data tree
  
 
= DAQ/Trigger Run Plans =
 
= DAQ/Trigger Run Plans =
  
 +
* SHMS & HMS Mode 10 runs
 +
 +
 +
 +
* Single arm EDTM runs at various rates
 +
 +
 +
 +
* Coincidence EDTM runs at various rates
 +
 +
 +
 +
* SHMS PID threshold scan with NGC in trigger (HGC was previously utilized)
 +
 +
 +
 +
* Single arm SHMS & HMS runs with EL-REAL and EL-CLEAN being readout (need to time these in at the TI front panel)
 +
 +
 +
 +
* Trigger PID threshold scans
  
  

Revision as of 09:06, 9 January 2018

Overview

Topics which are relevant to the DAQ/Trigger for the Spring 2018 commissioning run are discussed here.

To-Do

  • High Priority
    • Configure Dave G. Dead time measurement scheme (Arrington’s and/or Morhings thesis)
    • Configure NGC into SHMS PID trigger leg in place of HGC
    • Sanity check SHMS hodoscope CAMAC power supply (noticed unstable behavior during end of fall run)
    • Add SHMS PRSHWRSUM in trigger apparatus (FADC leaf)
    • Remove layer B from HMS pre-shower sum
  • Medium Priority
    • Figure out DAC to mV conversion factor, find old talk regarding setting the DAC values to obtain pedestals a pre-determined value
    • Include multi-hit capability in the trigger apparatus for reference times
    • Integrate TI scalers into report files
    • Configure OR of hodoscope trigger logic into TDC’s and scalers
    • Change trigger leaf names to PRLO from PRSHWRLO etc. (needs to match xscaler)
  • Low Priority
    • Add number of FADC error flags to the report files (front and center)
    • Add number of pulses identified in the window to data tree

DAQ/Trigger Run Plans

  • SHMS & HMS Mode 10 runs


  • Single arm EDTM runs at various rates


  • Coincidence EDTM runs at various rates


  • SHMS PID threshold scan with NGC in trigger (HGC was previously utilized)


  • Single arm SHMS & HMS runs with EL-REAL and EL-CLEAN being readout (need to time these in at the TI front panel)


  • Trigger PID threshold scans


Talks