Difference between revisions of "E-LOG"
From HallCWiki
Jump to navigationJump to search (→Day 13) |
|||
Line 1: | Line 1: | ||
==April 2018== | ==April 2018== | ||
===Friday 13=== | ===Friday 13=== | ||
+ | *Looked at reference time plots for hodoscopes/drift chambers tdc ans adc | ||
+ | to determine if the reference time cuts set in the parameter file | ||
+ | are OK (not cutting real triggers or real accidentals). |
Revision as of 09:41, 13 April 2018
April 2018
Friday 13
- Looked at reference time plots for hodoscopes/drift chambers tdc ans adc
to determine if the reference time cuts set in the parameter file are OK (not cutting real triggers or real accidentals).