Difference between revisions of "RC Meeting, Monday, August 20"
From HallCWiki
Jump to navigationJump to search(One intermediate revision by the same user not shown) | |||
Line 7: | Line 7: | ||
** Need to look into merging the KAON-LT shift instruction with existing instructions on the wiki | ** Need to look into merging the KAON-LT shift instruction with existing instructions on the wiki | ||
** New procedure for "on call" - will need to update list on wiki to reflect new on-call list | ** New procedure for "on call" - will need to update list on wiki to reflect new on-call list | ||
− | |||
* '''Target''' | * '''Target''' | ||
Line 22: | Line 21: | ||
* '''DAQ''' | * '''DAQ''' | ||
− | ** Hall B will be running in "delayed helicity reporting" - likely not an issue | + | ** Hall B will be running in "delayed helicity reporting" - likely not an issue (for now) |
Latest revision as of 08:02, 21 August 2018
- General
- No hall lockup tonight
- Beam is possible Tuesday night, but not likely. Will not cancel shifts until certain though.
- Issues with the upstream beamline vacuum. Ion pumps not yet on
- Still work to be done in hall before ready for lockup
- Need to look into merging the KAON-LT shift instruction with existing instructions on the wiki
- New procedure for "on call" - will need to update list on wiki to reflect new on-call list
- Target
- Scattering chamber leak repaired over the weekend (big thanks to Dave Meekins, Chris Keith, and Walter Kellner for coming in)
- Target cooldown underway
- SHMS
- HGC at 1 atm of C4F8O
- No bubbles at exit of DC1, but gas seems to be flowing
- HMS
- Cerenkov window repaired and installed
- Cerenkov at 0.45 atm, C4F8O
- DAQ
- Hall B will be running in "delayed helicity reporting" - likely not an issue (for now)