Difference between revisions of "Agendas for 12GeV software meetings"

From HallCWiki
Jump to navigationJump to search
Line 8: Line 8:
 
== March 20, 2012 ==
 
== March 20, 2012 ==
 
* First draft of [https://hallcweb.jlab.org/wiki/images/b/b1/Software_milestones.pdf milestones] fro the JLab Software Review. Send comments and corrections to Mark Jones (jones@jlab.org).
 
* First draft of [https://hallcweb.jlab.org/wiki/images/b/b1/Software_milestones.pdf milestones] fro the JLab Software Review. Send comments and corrections to Mark Jones (jones@jlab.org).
* [[Image:Software_Decoding.pdf]].  Discussion of building hit lists in Root analyzer.
+
* [[Image:Software_Decoding.pdf]].  Discussion of building hit lists in Root analyzer by Steve Wood.
*[[https://hallcweb.jlab.org/wiki/images/1/1b/Gn_hallc_software_03_20_2012.pdf Presentation]] by Gabi. Slides 3-5 are outline for talk to the JLab Software Review. Beginning with slide 7 is a discussion of strategy for developing the Hall C C++ analyzer with some specific exmaples.
+
*[https://hallcweb.jlab.org/wiki/images/1/1b/Gn_hallc_software_03_20_2012.pdf Presentation] by Gabi Niculescu. Slides 3-5 are outline for talk to the JLab Software Review. Beginning with slide 7 is a discussion of strategy for developing the Hall C C++ analyzer with some specific examples.

Revision as of 14:01, 20 March 2012

Calling in using phone number 866-740-1260 with code 1150811. Login into www.readytalk.com to view presentation.

Next meeting Tues April 3rd, 2012 at 1 pm in B101


March 20, 2012

  • First draft of milestones fro the JLab Software Review. Send comments and corrections to Mark Jones (jones@jlab.org).
  • File:Software Decoding.pdf. Discussion of building hit lists in Root analyzer by Steve Wood.
  • Presentation by Gabi Niculescu. Slides 3-5 are outline for talk to the JLab Software Review. Beginning with slide 7 is a discussion of strategy for developing the Hall C C++ analyzer with some specific examples.