Difference between revisions of "RC meeting and Run Plan, Thursday Nov 1"

From HallCWiki
Jump to: navigation, search
(Created page with "==Status== * Cruising through Kin Group 14 * Kin Group 17 comes next ==Issues== * Shift workers needed in the next week [https://misportal.jlab.org/mis/physics/shiftSchedule/...")
 
 
(4 intermediate revisions by the same user not shown)
Line 1: Line 1:
 
==Status==
 
==Status==
* Cruising through Kin Group 14
+
* Cruising through [https://hallcweb.jlab.org/wiki/index.php/5_pass_Run_Plan#Kinematic_Group_14 Kin Group 14]
* Kin Group 17 comes next
+
* [https://hallcweb.jlab.org/wiki/index.php/5_pass_Run_Plan#Kinematic_Group_17 Kin Group 17] comes next (starting with Kin17.6)
 +
*Reminders:
 +
** Take one [https://hallcweb.jlab.org/wiki/index.php/5_pass_Run_Plan#HMS_Monitoring_runs HMS monitoring] run each shift
 +
** For all settings, for each target, split the desired charge between three runs
 +
** <s> For all settings at 60uA, take one of the three runs at 30uA instead </s> No longer needed
 +
** Listed currents are ''estimates''. For runs at less than 60uA, increase current until SHMS singles rates are between 400k-500k.
  
 
==Issues==
 
==Issues==
 +
* Coin time [https://logbooks.jlab.org/entry/3619236 plot] [https://logbooks.jlab.org/entry/3619196 mark post 1] [https://logbooks.jlab.org/entry/3619207 mark post 2]
 +
* Small percentage of missing [https://logbooks.jlab.org/entry/3619241 ref times] in one run
 +
* RadCon NDX detector electronics [https://logbooks.jlab.org/entry/3619273 reboots]
 
* Shift workers needed in the next week [https://misportal.jlab.org/mis/physics/shiftSchedule/index.cfm?experimentRunId=HALLC-FALL-2018&startDate=4/10/2018&endDate=3/11/2019 shifts]
 
* Shift workers needed in the next week [https://misportal.jlab.org/mis/physics/shiftSchedule/index.cfm?experimentRunId=HALLC-FALL-2018&startDate=4/10/2018&endDate=3/11/2019 shifts]
 
** Day TO Sat/Sun
 
** Day TO Sat/Sun

Latest revision as of 16:45, 1 November 2018

Status

  • Cruising through Kin Group 14
  • Kin Group 17 comes next (starting with Kin17.6)
  • Reminders:
    • Take one HMS monitoring run each shift
    • For all settings, for each target, split the desired charge between three runs
    • For all settings at 60uA, take one of the three runs at 30uA instead No longer needed
    • Listed currents are estimates. For runs at less than 60uA, increase current until SHMS singles rates are between 400k-500k.

Issues

Planned access to the hall

  • No Planned Accesses