Difference between revisions of "RC meeting and Run Plan, Monday Nov 5"

From HallCWiki
Jump to: navigation, search
 
(2 intermediate revisions by the same user not shown)
Line 13: Line 13:
 
*Kin18.4    ...
 
*Kin18.4    ...
  
*Kin14.5   
+
*Kin16.4A
 +
*Kin16.6
 +
*Kin16.7A
  
SHMS POLARITY CHANGE (all else same)
+
SHMS POLARITY CHANGE
  
*Kin13.5   
+
*Kin15.7A
 
+
*Kin15.6
Then well start on Kin Groups 15 and 16
+
*Kin15.4A
  
 
==Reminders==
 
==Reminders==
Line 30: Line 32:
  
 
==Planned access to the hall==
 
==Planned access to the hall==
* No Planned Accesses
+
* Mark: escorted access to reset crate during RF Recovery
 +
** Andy: possibly join

Latest revision as of 22:25, 5 November 2018

Status

  • Down for Beam studies (~4hrs) today, should be up and running again this afternoon
  • Finishing up Kin Group 18
  • Hall D TAC run on Wednesday Day should not affect Hall C

Time-Ordered Run Plan

SHMS POLARITY CHANGE

  • Kin18.3 current setting
  • Kin18.4 ...
  • Kin16.4A
  • Kin16.6
  • Kin16.7A

SHMS POLARITY CHANGE

  • Kin15.7A
  • Kin15.6
  • Kin15.4A

Reminders

  • Take one HMS monitoring run each shift
  • For all settings, for each target, split the desired charge between three runs
  • Listed currents are estimates. For runs at less than 60uA, increase current until SHMS singles rates are between 400k-500k.

Issues

Planned access to the hall

  • Mark: escorted access to reset crate during RF Recovery
    • Andy: possibly join