= Current Status =
 
= Current Status =
* Accelerator issues had about 22 hours downtime on Friday-Saturday.  Recovered some of that time with truncated beam-studies today.
+
* Accelerator issues had about 20 hours downtime on Friday-Saturday.  Recovered some of that time with truncated beam-studies today.
 
* We had an SHMS Q3 trip/interlock and SHMS dipole trip/interlock that needed remote reseting by Steve Lassiter.  In both events we were able to recover with no issues.
 
* We had an SHMS Q3 trip/interlock and SHMS dipole trip/interlock that needed remote reseting by Steve Lassiter.  In both events we were able to recover with no issues.
 
* We will finish up officially at 8am tomorrow.
 
* We will finish up officially at 8am tomorrow.
Line 33: Line 33:
 
= Current Run Plan =
 
= Current Run Plan =
 
*  Running Kinematics-4 until end.
 
*  Running Kinematics-4 until end.
 +
*  Running the tail end of dummy now (MCC could only give us 40uA around 2:30pm).
 +
*  Swing shift will run a luminosity scan (10uA, 20uA, 30uA, and 40uA).
  
 
= Notices in Effect for Shift Crew =
 
= Notices in Effect for Shift Crew =

Latest revision as of 15:43, 4 March 2019

Main | Online | RC | Run Plan | Official Website | Redmine | Index | Nav
Jpsi007.png

RC Meeting Information

RC Daily Meetings are at 4:30 PM, 2nd floor Counting House Meeting Room

  • Bluejeans remote connection information:
 To join the Meeting:
 https://bluejeans.com/861439920
 To join via Room System:
 Video Conferencing System: bjn.vc -or-199.48.152.152
 Meeting ID : 861439920
 To join via phone :
 1)  Dial:
   +1.408.740.7256 (US (San Jose))
   +1.888.240.2560 (US Toll Free))
   +1.408.317.9253 (US (Primary, San Jose))
   (see all numbers - http://bluejeans.com/numbers)
 2)  Enter Conference ID : 861439920

Useful Links

Current Status

  • Accelerator issues had about 20 hours downtime on Friday-Saturday. Recovered some of that time with truncated beam-studies today.
  • We had an SHMS Q3 trip/interlock and SHMS dipole trip/interlock that needed remote reseting by Steve Lassiter. In both events we were able to recover with no issues.
  • We will finish up officially at 8am tomorrow.

Current Run Plan

  • Running Kinematics-4 until end.
  • Running the tail end of dummy now (MCC could only give us 40uA around 2:30pm).
  • Swing shift will run a luminosity scan (10uA, 20uA, 30uA, and 40uA).

Notices in Effect for Shift Crew

  • Shift Leader is responsible for 50k replays. Even if the TO is actually doing them.
  • Missing Reference Times during the replay: check in the 50k. Check in full replay, if able. If it happens, call RC. Guidance to solve it is here: https://logbooks.jlab.org/entry/3654584

Current Issues

Unresolved Issues:

Planned Accesses to the Hall

  • Tuesday during RF studies, the CSV program will set new kinematics (including a polarity switch with the HMS) and adjust the HMS Cherenkov pressure.

Planned Accelerator Configuration Changes

Special Requests