Difference between revisions of "5-pass optics for A1n"

From HallCWiki
Jump to navigationJump to search
(Created page with " '''Goals ''' - To calibrate angle and ytar reconstruction of HMS/SHMS spectrometers. - Time: estimate 8 hours of 40uA beam total. '''Setup''' - Beam Current: 40 uA...")
 
 
Line 8: Line 8:
 
   - SHMS setting: 30. deg, momentum: -2.0 GeV/c
 
   - SHMS setting: 30. deg, momentum: -2.0 GeV/c
 
   - Target:      Carbon Optics
 
   - Target:      Carbon Optics
   - Trigger:    ELCLEAN (PS3=0, with rest PS1,2 = -1) in both arms
+
   - Trigger:    3/4 trigger in both arms
 
   - Collimators: HMS (Sieve), SHMS (Centered Sieve)
 
   - Collimators: HMS (Sieve), SHMS (Centered Sieve)
  

Latest revision as of 18:43, 13 February 2020

Goals 
 - To calibrate angle and ytar reconstruction of HMS/SHMS spectrometers.
 - Time: estimate 8 hours of 40uA beam total.
Setup
 - Beam Current:   40 uA CW, 0.5mm raster 
 - HMS setting: 30. deg, momentum: -2.0 GeV/c
 - SHMS setting: 30. deg, momentum: -2.0 GeV/c
 - Target:      Carbon Optics
 - Trigger:     3/4 trigger in both arms
 - Collimators: HMS (Sieve), SHMS (Centered Sieve)
Procedure
 - Assume that the beam center checkout is complete.
 - Set HMS/SHMS magnets to -2.0 GeV/c and they are at 30 deg.
 - Insert HMS Sieve and SHMS Centered Sieve.
 - Insert Carbon Optics target
 - Ask for 40uA and 0.5mm raster size.
 - Take one hour runs. 
 - At 40uA need 8 hours*40uA = 1.1C of beam.