Difference between revisions of "RC Meeting and Run Plan, Thurs, January 16th 2020"

From HallCWiki
Jump to: navigation, search
(Created page with "= RC Meeting Information = <b> RC Daily Meetings are at 4:15 PM, 2nd floor Counting House Meeting Room </b> * Bluejeans remote connection information: To join the Meeting:...")
 
(Current Run Plan)
 
(2 intermediate revisions by the same user not shown)
Line 25: Line 25:
  
 
=General updates=
 
=General updates=
* Finished 1 pass at around 3:20am.
+
* Started  5pass around 6.
* Target changeover to 5pass.
+
*Beam checkout [https://hallcweb.jlab.org/wiki/index.php/Beam_and_Raster_Checkout_for_A1n/d2n_(Short_Procedure) Short procedure]
*TO class on Thursday in the Hall C counting room from 2:30 pm - 4:00 pm.
+
** Completed
 +
* Could not get above 5uA on owl shift.
 +
* Around 12:15 MMC could reach 30uA.
 +
*Glass cell Commissioning (1 hr each on two glass cells):[https://hallcweb.jlab.org/wiki/index.php/5-pass_production_for_A1n#Glass_Cell_Current_Scan.2FCheckout_and_Commissioning Run plan
 +
** Completed
  
 
= Current Run Plan =
 
= Current Run Plan =
 +
* Take NMR every 4 hours
 +
* Always take 50Hz of EDTM
  
 
+
== Thursday Swing/Owl ==  
== Wednesday Swing/Owl ==
+
*A3) production: [https://hallcweb.jlab.org/wiki/index.php/5-pass_production_for_A1n#Large_Angle_.2830-degree.29_Polarized_3He_Asymmetries_High_Momentum_Setting_.28Kine_4.2CB.29 Run Plan]
 
+
 
+
*Beam checkout [https://hallcweb.jlab.org/wiki/index.php/Beam_and_Raster_Checkout_for_A1n/d2n_(Short_Procedure) Short procedure]
+
** Want beam sigma between 100-300um.
+
** Checked with Jay. Promised 250-500um.
+
*Glass cell Commissioning (1 hr each on two glass cells):[https://hallcweb.jlab.org/wiki/index.php/5-pass_production_for_A1n#Glass_Cell_Current_Scan.2FCheckout_and_Commissioning Run plan
+
* Move SHMS back to 30deg.
+
*If target polarization is close to maximum, we go straight to
+
**A3) production: [https://hallcweb.jlab.org/wiki/index.php/5-pass_production_for_A1n#Large_Angle_.2830-degree.29_Polarized_3He_Asymmetries_High_Momentum_Setting_.28Kine_4.2CB.29 Run Plan]
+
*If not, do some "filler" runs. At any point within B3,B4 and B5, if target polarization is high enough, go back to A3) above.
+
**B3) Rate study with Ref 3He Cell: 2 hours at high momentum setting, 2 hours at the low momentum setting.[https://hallcweb.jlab.org/wiki/index.php/5-pass_production_for_A1n#Large_Angle_.2830-degree.29_Rate_study_with_3He_Reference_Cell_or_Polarized_3He_Cell Run Plan]
+
**B4) Cycle the magnet to high momentum setting. If this happens during day/swing, ask MCC to perform an energy measurement;
+
**B5) Vent the 3He from Ref Cell, take Empty, H2 and N2 (1-2 hours each),  [https://hallcweb.jlab.org/wiki/index.php/5-pass_production_for_A1n#Large_Angle_.2830-degree.29_Reference_Cell_H2_and_N2_Runs_.2820_hours_total.29 Run Plan]
+
  
  
== Thursday Day ==
+
== Friday Day ==
 
*Moller measurement will start around 8am.
 
*Moller measurement will start around 8am.
 
**Start with Moller setup and measurement at present Wien angle (last about 4 hours).
 
**Start with Moller setup and measurement at present Wien angle (last about 4 hours).
**Do three Wien angles to help with Hall C systematics and in general understanding of the machine. See [http://opsweb.acc.jlab.org/CSUEApps/atlis/task/20136 Atlis]
 
  
 
= Special Requests =
 
= Special Requests =

Latest revision as of 17:43, 16 January 2020

RC Meeting Information

RC Daily Meetings are at 4:15 PM, 2nd floor Counting House Meeting Room

  • Bluejeans remote connection information:
 To join the Meeting:
 https://bluejeans.com/861439920
 To join via Room System:
 Video Conferencing System: bjn.vc -or-199.48.152.152
 Meeting ID : 861439920
 To join via phone :
 1)  Dial:
   +1.408.740.7256 (US (San Jose))
   +1.888.240.2560 (US Toll Free))
   +1.408.317.9253 (US (Primary, San Jose))
   (see all numbers - http://bluejeans.com/numbers)
 2)  Enter Conference ID : 861439920

Useful Links

General updates

Current Run Plan

  • Take NMR every 4 hours
  • Always take 50Hz of EDTM

Thursday Swing/Owl


Friday Day

  • Moller measurement will start around 8am.
    • Start with Moller setup and measurement at present Wien angle (last about 4 hours).

Special Requests

  • Keep target expert schedule filled out on whiteboard
  • Andy Kenyon has parts ready for the nitrogen for the cooling jets.= Ongoing Work in the Hall
  • Bill Henry wants to removed a power supply from the hall. Need Radcon to survey it.

Notices in Effect for Shift Crew

  • Policy for CANS-related hall status change: Make a logbook entry when the hall goes in, or comes out of laser-controlled access.
  • Magnet policies
    • HMS Q1 must be ramped down in 50A steps in all cases
    • Do not ramp HMS Q2 to zero, only go to 10A and then switch off power.
  • Inform the RC of any access that the Target Team requires. The RC will coordinate with RadCon to make everything run smoothly.
  • The operators have been somewhat careful with our beam orbit locks. Please make sure that the orbit locks are enabled and the beam does not drift from its nominal position.
  • Ramp rate lock instructions are here and added to checklist[1]
  • Temporary Laser instructions can be found here [2]


Planned Accelerator Configuration Changes