Difference between revisions of "RC Meeting, Wednesday, October 14 , 2021"

From HallCWiki
Jump to: navigation, search
(Created page with "__NOTOC__ = RC Meeting Information = <b> RC Daily Meetings are at 10 am, remote </b> https://bluejeans.com/861439920 = Accelerator Status = # Very efficient beam delivery ov...")
 
 
(8 intermediate revisions by the same user not shown)
Line 2: Line 2:
  
 
= RC Meeting Information =
 
= RC Meeting Information =
<b> RC Daily Meetings are at 10 am, remote </b> https://bluejeans.com/861439920
+
<b> RC Daily Meetings are at 10 am, remote connection link: </b> https://bluejeans.com/861439920
  
 
= Accelerator Status =
 
= Accelerator Status =
 
# Very efficient beam delivery over the last 24 hours
 
# Very efficient beam delivery over the last 24 hours
# Hall A pass change shown as taking place on Monday on the white board --> this may change depending on commissioning progress. Could happen sooner if SBS comes up today.
+
# Hall A pass change shown as taking place on Monday on the white board --> this may change depending on commissioning progress. Hall A will know more once SBS comes up.
 
# Next week there will be a maintenance day (Wednesday on white board).  May be the possibility for access to the hall.
 
# Next week there will be a maintenance day (Wednesday on white board).  May be the possibility for access to the hall.
  
 
= Hall C Status =
 
= Hall C Status =
 
# Efficient data taking - no significant hall-related  downtime
 
# Efficient data taking - no significant hall-related  downtime
# So far we have collected approximately 1400 pions in this configuration
+
# So far we have collected 1290 pions (as of 7:40 am) in this configuration
 
# One large excursion in bender LHe level [https://logbooks.jlab.org/entry/3923841].  These excursions seem to happen every couple days [https://logbooks.jlab.org/entry/3924363]
 
# One large excursion in bender LHe level [https://logbooks.jlab.org/entry/3923841].  These excursions seem to happen every couple days [https://logbooks.jlab.org/entry/3924363]
  
Line 26: Line 26:
 
# Target ladder camera was identified to be bad: Joe Beaufait will purchase a replacement in the next funding cycle (<span style="color:red"> '''PENDING''' </span>)
 
# Target ladder camera was identified to be bad: Joe Beaufait will purchase a replacement in the next funding cycle (<span style="color:red"> '''PENDING''' </span>)
 
#* Still need to follow-up with Joe about when the purchase can be done.
 
#* Still need to follow-up with Joe about when the purchase can be done.
# Still running with no UPS on the SHMS cryo controls.  
+
# Still running with no UPS on the SHMS cryo controls. (<span style="color:red"> '''PENDING''' </span>)
  
 
= Special Requests =
 
= Special Requests =

Latest revision as of 09:24, 14 October 2021


RC Meeting Information

RC Daily Meetings are at 10 am, remote connection link: https://bluejeans.com/861439920

Accelerator Status

  1. Very efficient beam delivery over the last 24 hours
  2. Hall A pass change shown as taking place on Monday on the white board --> this may change depending on commissioning progress. Hall A will know more once SBS comes up.
  3. Next week there will be a maintenance day (Wednesday on white board). May be the possibility for access to the hall.

Hall C Status

  1. Efficient data taking - no significant hall-related downtime
  2. So far we have collected 1290 pions (as of 7:40 am) in this configuration
  3. One large excursion in bender LHe level [1]. These excursions seem to happen every couple days [2]

Current Run Plan

  1. Continue data taking until early Nov

Current Issues

  1. Replace flow switches for magnets: next opportunistic access (Joe Beaufait) ( PENDING )
  2. The HB has seen some fluctuations in the LHe levels. At the next opportunistic access Heidi would like to investigate the cryo line. ( PENDING )
    • Heidi believes this is related to a vacuum issue and the access is for diagnostic purposes only. Can be escorted during regular office hours (do not call her in at midnight for this)
    • If indeed it proves to be the case the only remedy would be to warm up the magnet and pump the region (which would be a multiple day operation)
    • So far the PID loops have done their job and Heidi (together with the shift crew) are keeping a close eye on the LHe levels
  3. Water flow to the dump aperture needs to be replaced: needs 4+h and Steve Suhring believes that it can wait until the SAD ( PENDING )
  4. Target ladder camera was identified to be bad: Joe Beaufait will purchase a replacement in the next funding cycle ( PENDING )
    • Still need to follow-up with Joe about when the purchase can be done.
  5. Still running with no UPS on the SHMS cryo controls. ( PENDING )

Special Requests