Difference between revisions of "June 30, 2022"

From HallCWiki
Jump to navigationJump to search
 
(9 intermediate revisions by the same user not shown)
Line 13: Line 13:
 
*** Possible energy loss in NL? Causing beam loss in arcs
 
*** Possible energy loss in NL? Causing beam loss in arcs
  
* Experiment status:                                                                                                                                                                                    
+
* Experiment status:
 +
 
 +
Yes it's
 +
[[File:HallC Mascot.JPG|300px]]
 +
day
 +
                                                                                                                                                                                 
 
** PionLT continues to make progress on run plan, though we are still behind schedule, unless Ops is able to deliver 80 uA at >50% efficiency  
 
** PionLT continues to make progress on run plan, though we are still behind schedule, unless Ops is able to deliver 80 uA at >50% efficiency  
 
** On page 91 of run plan ~30% of LD2 data collected. '''Dummy data taken for this setting'''.  Current Setting: Q2=3.85, W=3.07, x=0.31, high ε, SHMS left data taking.
 
** On page 91 of run plan ~30% of LD2 data collected. '''Dummy data taken for this setting'''.  Current Setting: Q2=3.85, W=3.07, x=0.31, high ε, SHMS left data taking.
Line 21: Line 26:
 
** When we're back this evening, check YAG/HARPs
 
** When we're back this evening, check YAG/HARPs
 
*** C-hole? Probably not needed?
 
*** C-hole? Probably not needed?
 +
** Shifts look good through to 09/07/22
 +
*** '''Thank you for signing up!'''
  
 
= Current Run Plan =                                                                                                                                                                                       
 
= Current Run Plan =                                                                                                                                                                                       
Line 39: Line 46:
 
* Multiple HMS Q1 interlocks in the past 24 hours (5 that I know of)
 
* Multiple HMS Q1 interlocks in the past 24 hours (5 that I know of)
 
** As an example - https://logbooks.jlab.org/entry/4009015
 
** As an example - https://logbooks.jlab.org/entry/4009015
** Needs investigating? Steve L has been tagged in posts, I'll call and follow up
+
** Ellen is taking a look this morning/afternoon
 +
* HGC pressure fluctuation?
 +
** Simona noticed it's at -1.72 now, I recall it was -1.69 last I saw it, nominally it's meant to be -1.47 - https://logbooks.jlab.org/entry/3998616
 +
** Will be added as a shift checklist item
  
 
= Planned Accesses to the Hall =
 
= Planned Accesses to the Hall =
  
* None planned, depending upon RadCon availability, access possible today though '''if absolutely necessary'''
+
* Ellen wants to take a look at the Q1 and Jixie wants to sort out a cabling issue with the SoLID detector. I'll arrange a sweep so we can drop to controlled.
 +
** Arranging with Radcon now, I'll keep people posted
 +
** Unless needed, will close up again ~16:00 (I'm expecting beam at ~17:30/18:00 unless we hear otherwise)
  
 
= Planned Accelerator Configuration Changes =
 
= Planned Accelerator Configuration Changes =

Latest revision as of 09:58, 30 June 2022

Current Status

  • Accelerator status:
    • Pretty unstable beam through swing and owl
    • Limited to a max of 30 uA
    • NL woes overnight at around 05:30
    • Will be down through day today (and probably into swing) due to lots of ongoing accelerator work
      • Day SL on call
        • Swing SL show up as usual, RC will contact if this changes
      • NL breaker replacement
      • BLM 8E02 investigations
      • More RF work
    • Hall D reported very unstable beam overnight too
      • Possible energy loss in NL? Causing beam loss in arcs
  • Experiment status:

Yes it's HallC Mascot.JPG day

    • PionLT continues to make progress on run plan, though we are still behind schedule, unless Ops is able to deliver 80 uA at >50% efficiency
    • On page 91 of run plan ~30% of LD2 data collected. Dummy data taken for this setting. Current Setting: Q2=3.85, W=3.07, x=0.31, high ε, SHMS left data taking.
    • Due to beam quality, several runs during swing had very unstable beam (at various currents, sometimes various currents within a run)
      • These runs aren't junk, but have been excluded from the total
    • Drift chamber noise is still absent in latest runs
    • When we're back this evening, check YAG/HARPs
      • C-hole? Probably not needed?
    • Shifts look good through to 09/07/22
      • Thank you for signing up!

Current Run Plan

Notices in Effect for Shift Crew

  • Please pro-rate ABU for max current limit in run plan (uA) in beam time accounting. For example, if we receive 15 uA instead of the max_current_limit in the run plan, then the ABU should be: ABU_prorated = 15/(max current limit) * ABU
  • Check the HMS/SHMS rates for when production starts, since for Heep coin. production SHMS saw higher rates. Make sure shift crew takes snapshot of scalers at every setting
  • When analysing LD2 or Al dummy or LH2, please leave the target_mass_amu in the standard.kinematics as that of the proton, but when analysing the data with the pionLT script, specify the target used, as different targets will have different ranges in the cuts when integrating the missing mass peak. Refer to log entry: https://logbooks.jlab.org/entry/4005387 These instructions are given in the pionLT run plan.
  • Keep on eye on HMS DC chamber wire maps.
  • Contact Brad S. before next spectrometer rotation (HMS or SHMS) unless (OWL shift)
    • Given current progress, this is probably going to be tomorrow day/swing

Current Issues

Planned Accesses to the Hall

  • Ellen wants to take a look at the Q1 and Jixie wants to sort out a cabling issue with the SoLID detector. I'll arrange a sweep so we can drop to controlled.
    • Arranging with Radcon now, I'll keep people posted
    • Unless needed, will close up again ~16:00 (I'm expecting beam at ~17:30/18:00 unless we hear otherwise)

Planned Accelerator Configuration Changes

Special Requests

  • Contact Brad S. if rotating SHMS at a decent hour
  • Prepare maple syrup and saskatoon pie in anticipation of Canada day tomorrow