Difference between revisions of "August 18, 2022"
From HallCWiki
Jump to navigationJump to search (Created page with "= RC Meeting Information = <b> RC Daily Meetings are at 11:00 (am) via Zoom and in person in the counting house meeting room (2nd floor) </b> * Zoom remote connection informa...") |
|||
(4 intermediate revisions by the same user not shown) | |||
Line 33: | Line 33: | ||
= Current Status = | = Current Status = | ||
* Excellent data taking overnight | * Excellent data taking overnight | ||
− | ** Q2=1.45, W=2.02, x=0.3118 | + | ** Q2=1.45, W=2.02, x=0.3118 high epsilon data taking - All done |
+ | *** [https://logbooks.jlab.org/entry/4030525 Right] | ||
+ | *** [https://logbooks.jlab.org/entry/4030689 Centre] | ||
+ | *** [https://logbooks.jlab.org/entry/4030694 Left] | ||
** FADC Deadtime study done | ** FADC Deadtime study done | ||
** Got through 3 HeePCoin settings | ** Got through 3 HeePCoin settings | ||
* Carbon hole was a little suboptimal, but on the verge of acceptable | * Carbon hole was a little suboptimal, but on the verge of acceptable | ||
** [https://logbooks.jlab.org/entry/4030399 Carbon Hole] | ** [https://logbooks.jlab.org/entry/4030399 Carbon Hole] | ||
+ | * Shift schedule looks amazing, only 4 open shifts left on the experiment | ||
+ | ** '''A huge thank you to everyone that has signed up for shifts''' | ||
= Current Run Plan = | = Current Run Plan = | ||
Line 45: | Line 50: | ||
*** Page 20 of the [https://redmine.jlab.org/attachments/download/1572/2022Runplan6p4GeV.pdf Run Plan] | *** Page 20 of the [https://redmine.jlab.org/attachments/download/1572/2022Runplan6p4GeV.pdf Run Plan] | ||
* If things go well, should be set for our final rotation to 5.5 degrees on Monday | * If things go well, should be set for our final rotation to 5.5 degrees on Monday | ||
+ | ** We'll re-assess this tomorrow and I'll arrange with Steve L/Walter on getting this done, hopefully Monday morning | ||
* Need to think about when we want the arc energy measurement and the BCM calibration | * Need to think about when we want the arc energy measurement and the BCM calibration | ||
= Notices in Effect for Shift Crew = | = Notices in Effect for Shift Crew = | ||
* If all SHMS magnets crash at the same time, push the SHMS dipole crash button (on the rack above the target heater manual controls and target temperature readbacks). | * If all SHMS magnets crash at the same time, push the SHMS dipole crash button (on the rack above the target heater manual controls and target temperature readbacks). | ||
− | |||
* For physics settings that come in quickly, please see - [https://logbooks.jlab.org/entry/4029809 Analysis Note #1] [https://logbooks.jlab.org/entry/4030249 Analysis Note #2] | * For physics settings that come in quickly, please see - [https://logbooks.jlab.org/entry/4029809 Analysis Note #1] [https://logbooks.jlab.org/entry/4030249 Analysis Note #2] | ||
+ | * Please see updated CoVID guidance for the weekend - [https://hallcweb.jlab.org/wiki/index.php/COVID_guidance_for_weekend_shift-workers Weekend CoVID Guidance] | ||
= Current Issues = | = Current Issues = |
Latest revision as of 10:13, 18 August 2022
RC Meeting Information
RC Daily Meetings are at 11:00 (am) via Zoom and in person in the counting house meeting room (2nd floor)
- Zoom remote connection information:
Join ZoomGov Meeting https://jlab-org.zoomgov.com/j/1607100885?pwd=ZFBsRTFsYm5Zb0laZ0tyZXNjcEE0QT09 Meeting ID: 160 710 0885 Passcode: 595071 One tap mobile +16692545252,,1607100885# US (San Jose) +16468287666,,1607100885# US (New York) Dial by your location +1 669 254 5252 US (San Jose) +1 646 828 7666 US (New York) +1 669 216 1590 US (San Jose) +1 551 285 1373 US 833 568 8864 US Toll-free Meeting ID: 160 710 0885 Find your local number: https://jlab-org.zoomgov.com/u/ab2CekLXgQ
Useful Links
- Shift Signup (Read only)
- PionLT_2022_Physics_Status
- KaonLT Logbook - Used for PionLT updates too
- Physics analysis updates should be cross posted here
- Run Plans
- Hall-C Controls
- Hall-C Logbook
- MCC White Board
Current Status
- Excellent data taking overnight
- Carbon hole was a little suboptimal, but on the verge of acceptable
- Shift schedule looks amazing, only 4 open shifts left on the experiment
- A huge thank you to everyone that has signed up for shifts
Current Run Plan
- Aerogel tray change
- Continue with physics data taking once we're back
- Starting on the Q2 = 2.73, W = 2.63, x = 0.3115 low epsilon SHMS right (7.66) setting
- Page 20 of the Run Plan
- Starting on the Q2 = 2.73, W = 2.63, x = 0.3115 low epsilon SHMS right (7.66) setting
- If things go well, should be set for our final rotation to 5.5 degrees on Monday
- We'll re-assess this tomorrow and I'll arrange with Steve L/Walter on getting this done, hopefully Monday morning
- Need to think about when we want the arc energy measurement and the BCM calibration
Notices in Effect for Shift Crew
- If all SHMS magnets crash at the same time, push the SHMS dipole crash button (on the rack above the target heater manual controls and target temperature readbacks).
- For physics settings that come in quickly, please see - Analysis Note #1 Analysis Note #2
- Please see updated CoVID guidance for the weekend - Weekend CoVID Guidance
Current Issues
- Coffee maker broken! Emergency instant coffee in Counting House.
Planned Accesses to the Hall
- Aerogel change today
- Opportunistic access from Jixie and Ellen
Special Requests
- Fix coffee machine, or replace.