Difference between revisions of "Sep 19 2022"
From HallCWiki
Jump to navigationJump to search(3 intermediate revisions by the same user not shown) | |||
Line 27: | Line 27: | ||
= Current Status = | = Current Status = | ||
− | * | + | * LD2 MF Kinematics Analysis ---> https://logbooks.jlab.org/entry/4043852 |
− | * | + | * C12 MF Kinematics Analysis ---> https://logbooks.jlab.org/entry/4043869 |
− | + | * 100K event sample statistics --> https://logbooks.jlab.org/entry/4043951 | |
= Current Run Plan = | = Current Run Plan = | ||
Line 46: | Line 46: | ||
** Ca48 - <span style="color:darkgreen"> '''DONE''' </span> | ** Ca48 - <span style="color:darkgreen"> '''DONE''' </span> | ||
** Ca40 - <span style="color:darkgreen"> '''DONE''' </span> | ** Ca40 - <span style="color:darkgreen"> '''DONE''' </span> | ||
− | ** Fe54 - <span style="color: | + | ** Fe54 - <span style="color:darkgreen"> '''DONE''' </span> |
− | ** Be9 - <span style="color: | + | ** Be9 - <span style="color:darkgreen"> '''DONE''' </span> |
− | ** | + | ** B10 - <span style="color:darkgreen"> '''DONE''' </span> |
− | ** | + | ** B11 - <span style="color:red"> '''PENDING''' </span> |
* Proceed to CaFe production @ src kinematics for all targets (<span style="color:red"> '''PENDING''' </span>) | * Proceed to CaFe production @ src kinematics for all targets (<span style="color:red"> '''PENDING''' </span>) | ||
Line 68: | Line 68: | ||
= Notices in Effect for Shift Crew = | = Notices in Effect for Shift Crew = | ||
− | |||
= Current Issues = | = Current Issues = | ||
Line 79: | Line 78: | ||
= Special Requests = | = Special Requests = | ||
− | * | + | * During RF recovery tomorrow, we would like to schedule a Hall C Walkthrough for some users, but a time frame of when RF recovery will be done is needed. Shawn Frierson has been contacted. Awaiting response . . . |
Latest revision as of 14:35, 19 September 2022
RC Meeting Information
RC Daily Meetings are at 11:00 (am) via Zoom and in person in the counting house meeting room (2nd floor)
- Zoom remote connection information:
Join ZoomGov Meeting https://jlab-org.zoomgov.com/j/1607100885?pwd=ZFBsRTFsYm5Zb0laZ0tyZXNjcEE0QT09 Meeting ID: 160 710 0885 Passcode: 595071 One tap mobile +16692545252,,1607100885# US (San Jose) +16468287666,,1607100885# US (New York) Dial by your location +1 669 254 5252 US (San Jose) +1 646 828 7666 US (New York) +1 669 216 1590 US (San Jose) +1 551 285 1373 US 833 568 8864 US Toll-free Meeting ID: 160 710 0885 Find your local number: https://jlab-org.zoomgov.com/u/ab2CekLXgQ
Useful Links
Current Status
- LD2 MF Kinematics Analysis ---> https://logbooks.jlab.org/entry/4043852
- C12 MF Kinematics Analysis ---> https://logbooks.jlab.org/entry/4043869
- 100K event sample statistics --> https://logbooks.jlab.org/entry/4043951
Current Run Plan
- page 7 of CaFe Run Plan
- Resume beam tune to Hall C / Ion Chamber calibration with "No target" ( DONE )
- Do "Aluminum Hole" check to center BEAM on target ( DONE )
- Do Ion Chamber calibration for solid (using Thorium, 6% R.L.), and cryotargets (LH2, LD2) ( DONE )
- Ramp back up SHMS magnets to do trigger checkout using LH2 ( DONE )
- Do SHMS Hodo HV test / proton absorption / heep normalization ( DONE )
- Proceed to CaFe production @ mean-field kinematics for all targets ( IN-PROGRESS )
- LD2 - DONE
- Al Dummy - DONE
- C12 - DONE
- Ca48 - DONE
- Ca40 - DONE
- Fe54 - DONE
- Be9 - DONE
- B10 - DONE
- B11 - PENDING
- Proceed to CaFe production @ src kinematics for all targets ( PENDING )
- Ca40 - PENDING
- Ca48 - PENDING
- Fe54 - PENDING
- C12 - PENDING
- LD2 - PENDING
- Be9 - PENDING
- B10 - PENDING
- B11 - PENDING
- Al Dummy - PENDING
- Whenever MCC is able to deliver 70-75 uA stable beam current:
- coordinate with D. Mack to do BCM calibrations ( PENDING )
- do Target Boiling study whenever we have LD2 target in place (to save time of having to do target changes) ( PENDING )
Notices in Effect for Shift Crew
Current Issues
Planned Accesses to the Hall
Planned Accelerator Configuration Changes
Special Requests
- During RF recovery tomorrow, we would like to schedule a Hall C Walkthrough for some users, but a time frame of when RF recovery will be done is needed. Shawn Frierson has been contacted. Awaiting response . . .