= Current Status =
 
= Current Status =
* LD2 MF Kinematics Analysis ---> https://logbooks.jlab.org/entry/4043852
+
* RF Recovery started at 8:00 AM
* C12 MF Kinematics Analysis ---> https://logbooks.jlab.org/entry/4043869
+
** MCC  will try to bring Hall C up to high current (70 uA?) during Swing Shift
* 100K event sample statistics --> https://logbooks.jlab.org/entry/4043951
+
 
 +
* Completed mean-field kinematics and switched to SRC kinematics ---> https://logbooks.jlab.org/entry/4044321
 +
** collected ~ 40-min worth of statistics at 40-50 uA
 +
** will do full analysis / check histograms for better estimates of Ca-40 SRC rates
  
 
= Current Run Plan =
 
= Current Run Plan =
  
*page 7 of [https://hallcweb.jlab.org/wiki/images/0/05/Cafe_runplan_10_6GeV.pdf CaFe Run Plan]
+
*page 8 of [https://hallcweb.jlab.org/wiki/images/0/05/Cafe_runplan_10_6GeV.pdf CaFe Run Plan]
  
 
* Resume beam tune to Hall C / Ion Chamber calibration with "No target" (<span style="color:darkgreen"> '''DONE''' </span>)
 
* Resume beam tune to Hall C / Ion Chamber calibration with "No target" (<span style="color:darkgreen"> '''DONE''' </span>)
Line 68: Line 71:
  
 
= Notices in Effect for Shift Crew =
 
= Notices in Effect for Shift Crew =
 +
* If beam is down, for extended period, take daily 15-min. FADC no threshold run as per Bob Michales instructions, to keep check pedestals and make sure data is not thrown away.  This is just as sanity check, and should be done for any running  experiment
  
 
= Current Issues =
 
= Current Issues =
  
 
= Planned Accesses to the Hall =
 
= Planned Accesses to the Hall =
*
+
* Hall C walkthrough given by J. Beaufait @ 10 AM, while Hall C in Controlled Access (since accelerator is on RF recovery)
  
 
= Planned Accelerator Configuration Changes =
 
= Planned Accelerator Configuration Changes =
Line 78: Line 82:
  
 
= Special Requests =
 
= Special Requests =
* During RF recovery tomorrow, we would like to schedule a Hall C Walkthrough for some users, but a time frame of when RF recovery will be done is needed. Shawn Frierson has been contacted. Awaiting response . . .
+
*

Latest revision as of 08:56, 20 September 2022

RC Meeting Information

RC Daily Meetings are at 11:00 (am) via Zoom and in person in the counting house meeting room (2nd floor)

  • Zoom remote connection information:
 Join ZoomGov Meeting
 https://jlab-org.zoomgov.com/j/1607100885?pwd=ZFBsRTFsYm5Zb0laZ0tyZXNjcEE0QT09
 Meeting ID: 160 710 0885
 Passcode: 595071
 One tap mobile
 +16692545252,,1607100885# US (San Jose)
 +16468287666,,1607100885# US (New York)
 Dial by your location
       +1 669 254 5252 US (San Jose)
       +1 646 828 7666 US (New York)
       +1 669 216 1590 US (San Jose)
       +1 551 285 1373 US
       833 568 8864 US Toll-free
 Meeting ID: 160 710 0885
 Find your local number: https://jlab-org.zoomgov.com/u/ab2CekLXgQ

Useful Links

Current Status

  • RF Recovery started at 8:00 AM
    • MCC will try to bring Hall C up to high current (70 uA?) during Swing Shift
  • Completed mean-field kinematics and switched to SRC kinematics ---> https://logbooks.jlab.org/entry/4044321
    • collected ~ 40-min worth of statistics at 40-50 uA
    • will do full analysis / check histograms for better estimates of Ca-40 SRC rates

Current Run Plan

  • Resume beam tune to Hall C / Ion Chamber calibration with "No target" ( DONE )
  • Do "Aluminum Hole" check to center BEAM on target ( DONE )
  • Do Ion Chamber calibration for solid (using Thorium, 6% R.L.), and cryotargets (LH2, LD2) ( DONE )
  • Ramp back up SHMS magnets to do trigger checkout using LH2 ( DONE )
  • Do SHMS Hodo HV test / proton absorption / heep normalization ( DONE )
  • Proceed to CaFe production @ mean-field kinematics for all targets ( IN-PROGRESS )
    • LD2 - DONE
    • Al Dummy - DONE
    • C12 - DONE
    • Ca48 - DONE
    • Ca40 - DONE
    • Fe54 - DONE
    • Be9 - DONE
    • B10 - DONE
    • B11 - DONE
  • Proceed to CaFe production @ src kinematics for all targets ( IN-PROGRESS )
    • Ca40 - IN-PROGRESS
    • Ca48 - PENDING
    • Fe54 - PENDING
    • C12 - PENDING
    • LD2 - PENDING
    • Be9 - PENDING
    • B10 - PENDING
    • B11 - PENDING
    • Al Dummy - PENDING


  • Whenever MCC is able to deliver 70-75 uA stable beam current:
    • coordinate with D. Mack to do BCM calibrations ( PENDING )
    • do Target Boiling study whenever we have LD2 target in place (to save time of having to do target changes) ( PENDING )

Notices in Effect for Shift Crew

  • If beam is down, for extended period, take daily 15-min. FADC no threshold run as per Bob Michales instructions, to keep check pedestals and make sure data is not thrown away. This is just as sanity check, and should be done for any running experiment

Current Issues

Planned Accesses to the Hall

  • Hall C walkthrough given by J. Beaufait @ 10 AM, while Hall C in Controlled Access (since accelerator is on RF recovery)

Planned Accelerator Configuration Changes

Special Requests