Difference between revisions of "October 25, 2022"

From HallCWiki
Jump to navigationJump to search
(Created page with "= RC Meeting Information = * [https://hallcweb.jlab.org/wiki/index.php/RC_daily_meetings_fall_2022 Return to RC meeting main page] <b> RC Daily Meetings are at 11:00 (am) via...")
 
 
(One intermediate revision by the same user not shown)
Line 47: Line 47:
 
* watch beam stability
 
* watch beam stability
 
* need more shift workers (always)
 
* need more shift workers (always)
 +
* SHMS rates high (~3k w/o PS), 6M events per run?
  
 
= To do =
 
= To do =
Line 52: Line 53:
 
* calibrate SHMS Dipole LN2 valve during next access https://logbooks.jlab.org/entry/4064490. For now, monitor the ice accumulation if any https://logbooks.jlab.org/entry/4064528
 
* calibrate SHMS Dipole LN2 valve during next access https://logbooks.jlab.org/entry/4064490. For now, monitor the ice accumulation if any https://logbooks.jlab.org/entry/4064528
 
* reboot or replace the SHMS angle camera https://logbooks.jlab.org/entry/4067528
 
* reboot or replace the SHMS angle camera https://logbooks.jlab.org/entry/4067528
 +
* replace GEM gas bottle
 +
* UNSER calibration

Latest revision as of 09:53, 25 October 2022

RC Meeting Information

RC Daily Meetings are at 11:00 (am) via Zoom and in person in the counting house meeting room (2nd floor)

  • Zoom remote connection information:
 Join ZoomGov Meeting
 https://jlab-org.zoomgov.com/j/1607100885?pwd=ZFBsRTFsYm5Zb0laZ0tyZXNjcEE0QT09
 Meeting ID: 160 710 0885
 Passcode: 595071
 One tap mobile
 +16692545252,,1607100885# US (San Jose)
 +16468287666,,1607100885# US (New York)
 Dial by your location
       +1 669 254 5252 US (San Jose)
       +1 646 828 7666 US (New York)
       +1 669 216 1590 US (San Jose)
       +1 551 285 1373 US
       833 568 8864 US Toll-free
 Meeting ID: 160 710 0885
 Find your local number: https://jlab-org.zoomgov.com/u/ab2CekLXgQ

Useful Links

Current Status

  • SHMS: 8 degrees, -9.2 GeV, 1x, 2x 1-7 off
  • HMS: 20 degrees, -4.27 GeV (setting 5)
  • 5pass beam, 30 to 60uA

Run Plan

  • Continue data taking.
  • MCC is planning (not scheduled) a beam current ramp rate test, up to 5uA/s for Hall C. Target expert (Silviu) said all targets are fine.
  • Hall A pass change next week ( Monday the 31st ?)
  • Short RF recovery on Thursday

Issues

Notes

  • watch beam stability
  • need more shift workers (always)
  • SHMS rates high (~3k w/o PS), 6M events per run?

To do