Difference between revisions of "December 7, 2022"

From HallCWiki
Jump to: navigation, search
(Current Status)
(Current Status)
 
Line 36: Line 36:
 
** Fill Helium-3 cell with Helium-4 and check for leaking over the next several days.
 
** Fill Helium-3 cell with Helium-4 and check for leaking over the next several days.
 
** If it appears stable, return the Helium-3  
 
** If it appears stable, return the Helium-3  
 +
** Or if the leak is fixed, leave at the pressure it currently is
 
* Target boiling study: SHMS at 20.0 degrees (-4.4 GeV) and HMS at 20 degrees (-4.4 GeV)  
 
* Target boiling study: SHMS at 20.0 degrees (-4.4 GeV) and HMS at 20 degrees (-4.4 GeV)  
 
** Finished He-3, He-4, Dummy, and limited carbon before beam stopped at 8 am.
 
** Finished He-3, He-4, Dummy, and limited carbon before beam stopped at 8 am.

Latest revision as of 12:08, 7 December 2022

RC Meeting Information

RC Daily Meetings are at 11:00 (am) via Zoom and in person in the counting house meeting room (2nd floor)

  • Zoom remote connection information:
 Join ZoomGov Meeting
 https://jlab-org.zoomgov.com/j/1607100885?pwd=ZFBsRTFsYm5Zb0laZ0tyZXNjcEE0QT09
 Meeting ID: 160 710 0885
 Passcode: 595071
 One tap mobile
 +16692545252,,1607100885# US (San Jose)
 +16468287666,,1607100885# US (New York)
 Dial by your location
       +1 669 254 5252 US (San Jose)
       +1 646 828 7666 US (New York)
       +1 669 216 1590 US (San Jose)
       +1 551 285 1373 US
       833 568 8864 US Toll-free
 Meeting ID: 160 710 0885
 Find your local number: https://jlab-org.zoomgov.com/u/ab2CekLXgQ

Useful Links

Current Status

  • Currently in Controlled Access during the RF recovery
  • HMS Q1 power supply. Ellen replace the signal conditioner: https://logbooks.jlab.org/entry/4097300
  • Helium-3 pressure problems: https://logbooks.jlab.org/entry/4097562
    • Likely a leak in the Helium-3 cell which was fixed by Dave
    • Warm up and recover Helium-3.
    • Fill Helium-3 cell with Helium-4 and check for leaking over the next several days.
    • If it appears stable, return the Helium-3
    • Or if the leak is fixed, leave at the pressure it currently is
  • Target boiling study: SHMS at 20.0 degrees (-4.4 GeV) and HMS at 20 degrees (-4.4 GeV)
    • Finished He-3, He-4, Dummy, and limited carbon before beam stopped at 8 am.

Run Plan

  • Target Boiling
  • BCM Calibration?
  • Energy Measurement?