= Current Status =
 
= Current Status =
* Currently in the second cycle of the first momentum of HMS high x at 35 degrees.  
+
* All shifts are filled until SAD. Thanks Hakob!
* Yesterday  
+
* Shift Summaries
** BCM calibrations did not work, as the unser was saturated.
+
** [https://logbooks.jlab.org/entry/4102134 Day (12/15)]
 +
** [https://logbooks.jlab.org/entry/4102213 Swing (12/15)]
 +
** [https://logbooks.jlab.org/entry/4102308 Owl (12/16)]
 +
* Today (12/16)
 +
** Currently in the second cycle of Setting 1 of HMS high x at 35 degrees.
 +
** BCM calibration after this meeting if the unser offset is still behaving.  
 +
* Yesterday (12/15)
 +
** BCM calibrations did not work, as the unser was saturated due to a large offset.
 
*** Dave Mack came in and [https://logbooks.jlab.org/entry/4102233 power cycled it].  
 
*** Dave Mack came in and [https://logbooks.jlab.org/entry/4102233 power cycled it].  
 +
*** [https://logbooks.jlab.org/entry/4102427 But it is misbehaving again this morning]. Dave G cycled it and it should be okay now.
 +
*** Could the radiation from the Beam Energy Measurement mishap killed the unser UPS in the hall? 
 +
** [https://logbooks.jlab.org/entry/4102214 PSS Failure: Hall C suddenly dropped to Restricted Access around 4pm].
 +
*** Hall Swept and Run-Save Boxes armed. Back to Beam permit around 5:30 PM.
 +
** Unable to send stable 40uA beam until about 7:30 pm due to thunderstorms.
 +
** Smooth data collection afterwards and through the night, although [https://logbooks.jlab.org/entry/4102326 HMS CODA needed to be restarted once].
 +
  
 
= Current Run Plan =
 
= Current Run Plan =
*
+
* BCM Calibration after this RC meeting
 +
* Continue with run plan printed sheet. High x HMS at 35 degrees.
  
 
= Notices in Effect for Shift Crew =
 
= Notices in Effect for Shift Crew =
*
+
* Continue to fill out SHMS excel sheet for good electrons .
 +
* Keep SHMS prescaled rate below 8kHz.
  
 
= Current Issues =
 
= Current Issues =
*
+
* HMS Dipole NMR lock struggling to hold. Should be fine, as when it does lock for a few minutes at a time, it is reading back the correct field.
 +
** Although it might make chaining to the next HMS momentum difficult. 
 +
* Unser offset issues may still be persisting. Dave Mack has been emailed about it.
  
 
= Planned Accesses to the Hall =
 
= Planned Accesses to the Hall =
*
+
* I'm wondering if we may need to replace unser UPS in the hall. Waiting to hear back from Dave Mack on what he thinks.
  
 
= Planned Accelerator Configuration Changes =
 
= Planned Accelerator Configuration Changes =

Latest revision as of 11:56, 16 December 2022

RC Meeting Information

RC Daily Meetings are at 11:00 (am) via Zoom and in person in the counting house meeting room (2nd floor)

  • Zoom remote connection information:
 Join ZoomGov Meeting
 https://jlab-org.zoomgov.com/j/1607100885?pwd=ZFBsRTFsYm5Zb0laZ0tyZXNjcEE0QT09
 Meeting ID: 160 710 0885
 Passcode: 595071
 One tap mobile
 +16692545252,,1607100885# US (San Jose)
 +16468287666,,1607100885# US (New York)
 Dial by your location
       +1 669 254 5252 US (San Jose)
       +1 646 828 7666 US (New York)
       +1 669 216 1590 US (San Jose)
       +1 551 285 1373 US
       833 568 8864 US Toll-free
 Meeting ID: 160 710 0885
 Find your local number: https://jlab-org.zoomgov.com/u/ab2CekLXgQ

Useful Links

Current Status


Current Run Plan

  • BCM Calibration after this RC meeting
  • Continue with run plan printed sheet. High x HMS at 35 degrees.

Notices in Effect for Shift Crew

  • Continue to fill out SHMS excel sheet for good electrons .
  • Keep SHMS prescaled rate below 8kHz.

Current Issues

  • HMS Dipole NMR lock struggling to hold. Should be fine, as when it does lock for a few minutes at a time, it is reading back the correct field.
    • Although it might make chaining to the next HMS momentum difficult.
  • Unser offset issues may still be persisting. Dave Mack has been emailed about it.

Planned Accesses to the Hall

  • I'm wondering if we may need to replace unser UPS in the hall. Waiting to hear back from Dave Mack on what he thinks.

Planned Accelerator Configuration Changes

Special Requests