Difference between revisions of "December 18, 2022"
From HallCWiki
Jump to navigationJump to search(6 intermediate revisions by the same user not shown) | |||
Line 29: | Line 29: | ||
= Current Status = | = Current Status = | ||
− | * Hall C is currently down due to another PSS error that suddenly put Hall C in restricted access | + | * [https://logbooks.jlab.org/entry/4102994 Hall C is currently down due to another PSS error] [https://logbooks.jlab.org/entry/4102973 that suddenly put Hall C in restricted access.] |
** Expert on-call unable to solve issue. | ** Expert on-call unable to solve issue. | ||
− | ** Experts | + | ** Experts came in at 8:00 AM |
** PD meeting scheduled for 9AM to discuss further | ** PD meeting scheduled for 9AM to discuss further | ||
− | + | *** Verbal report at the meeting: hardware has been replaced and is being tested and hopefully will be back up before noon. | |
+ | ** Going to attempt to sweep and arm and go back to beam permit 10:45 AM | ||
* Shift Summaries | * Shift Summaries | ||
** [https://logbooks.jlab.org/entry/4102759 Day 12/17] | ** [https://logbooks.jlab.org/entry/4102759 Day 12/17] | ||
Line 45: | Line 46: | ||
** Changed to Setting 2 of HMS high x at 35 degrees at the start of swing shift. | ** Changed to Setting 2 of HMS high x at 35 degrees at the start of swing shift. | ||
** Smooth running until 1L21 cavity dropping at 00:20, followed by PSS error | ** Smooth running until 1L21 cavity dropping at 00:20, followed by PSS error | ||
+ | ** HCDESK 4 got bumped and logged out when we were messing with cables to get the TV screens back | ||
+ | *** Logged back to redhat as cdaq user and restored vnc and scripts with no problem. | ||
= Current Run Plan = | = Current Run Plan = | ||
* Continue with Setting 2. | * Continue with Setting 2. | ||
− | ** Are there any changes that need to happen due to beam being down all night? | + | ** Are there any changes that need to happen to the run plan due to beam being down all night? |
= Notices in Effect for Shift Crew = | = Notices in Effect for Shift Crew = | ||
Line 55: | Line 58: | ||
= Current Issues = | = Current Issues = | ||
* Hall C in restricted access due to PSS Error. | * Hall C in restricted access due to PSS Error. | ||
− | * | + | * MCC investigating as to why the Energy Measurement failed so badly. |
+ | ** Email from Jay Benesch: "Beam should be about 2 mm sigma in the horizontal due to peak | ||
+ | dispersion. Beam line 22 mm ID, centroid horizontal offset only 1 mm so | ||
+ | ten sigma should have sufficed." | ||
+ | ** Mentioned in meeting that they have changed the procedure to have 2uA tune beam when during certain parts of the measurement when possible (instead of 10uA). | ||
+ | *** (Said quite a few things that I didn't understand about some technical things). | ||
+ | ** We should continue to follow up with them to get the mystery solved before the next beam energy measurement. | ||
* What do we need to do for Monday? | * What do we need to do for Monday? | ||
** Warm up target. | ** Warm up target. | ||
Line 61: | Line 70: | ||
** Turn off HVs | ** Turn off HVs | ||
*** Leave any on? | *** Leave any on? | ||
+ | * What do we need to do before we come back in January? (Is this meeting the place to take about it?) | ||
+ | ** Unser issues. | ||
+ | ** HDMI cables and adapters for the TVs that keep disconnecting. | ||
= Planned Accesses to the Hall = | = Planned Accesses to the Hall = |
Latest revision as of 10:53, 18 December 2022
RC Meeting Information
RC Daily Meetings are at 11:00 (am) via Zoom and in person in the counting house meeting room (2nd floor)
- Zoom remote connection information:
Join ZoomGov Meeting https://jlab-org.zoomgov.com/j/1607100885?pwd=ZFBsRTFsYm5Zb0laZ0tyZXNjcEE0QT09 Meeting ID: 160 710 0885 Passcode: 595071 One tap mobile +16692545252,,1607100885# US (San Jose) +16468287666,,1607100885# US (New York) Dial by your location +1 669 254 5252 US (San Jose) +1 646 828 7666 US (New York) +1 669 216 1590 US (San Jose) +1 551 285 1373 US 833 568 8864 US Toll-free Meeting ID: 160 710 0885 Find your local number: https://jlab-org.zoomgov.com/u/ab2CekLXgQ
Useful Links
Current Status
- Hall C is currently down due to another PSS error that suddenly put Hall C in restricted access.
- Expert on-call unable to solve issue.
- Experts came in at 8:00 AM
- PD meeting scheduled for 9AM to discuss further
- Verbal report at the meeting: hardware has been replaced and is being tested and hopefully will be back up before noon.
- Going to attempt to sweep and arm and go back to beam permit 10:45 AM
- Shift Summaries
- Today
- When beam comes back, continue with the run plan on Setting 2.
- Yesterday
- Changed to Setting 2 of HMS high x at 35 degrees at the start of swing shift.
- Smooth running until 1L21 cavity dropping at 00:20, followed by PSS error
- HCDESK 4 got bumped and logged out when we were messing with cables to get the TV screens back
- Logged back to redhat as cdaq user and restored vnc and scripts with no problem.
Current Run Plan
- Continue with Setting 2.
- Are there any changes that need to happen to the run plan due to beam being down all night?
Notices in Effect for Shift Crew
- Continue to fill out SHMS Excel Spreadsheet.
Current Issues
- Hall C in restricted access due to PSS Error.
- MCC investigating as to why the Energy Measurement failed so badly.
- Email from Jay Benesch: "Beam should be about 2 mm sigma in the horizontal due to peak
dispersion. Beam line 22 mm ID, centroid horizontal offset only 1 mm so ten sigma should have sufficed."
- Mentioned in meeting that they have changed the procedure to have 2uA tune beam when during certain parts of the measurement when possible (instead of 10uA).
- (Said quite a few things that I didn't understand about some technical things).
- We should continue to follow up with them to get the mystery solved before the next beam energy measurement.
- Mentioned in meeting that they have changed the procedure to have 2uA tune beam when during certain parts of the measurement when possible (instead of 10uA).
- What do we need to do for Monday?
- Warm up target.
- Power Down the magnets
- Turn off HVs
- Leave any on?
- What do we need to do before we come back in January? (Is this meeting the place to take about it?)
- Unser issues.
- HDMI cables and adapters for the TVs that keep disconnecting.