Difference between revisions of "February 22, 2023"
From HallCWiki
Jump to navigationJump to search (Created page with "= Under Construction = = RC Meeting Information = <b> RC Daily Meetings are at 11:00 (am) via Zoom and in person in the counting house meeting room (2nd floor) </b> * Zoom r...") |
|||
Line 39: | Line 39: | ||
= Current Status = | = Current Status = | ||
− | * | + | * taking data on Au target in MF kinematic |
− | |||
− | |||
− | |||
− | |||
= Current Run Plan = | = Current Run Plan = | ||
− | * | + | * continue taking data on Au for MF and SRC kinematic until Friday morning or statistics achieved. |
− | |||
= Issues/updates = | = Issues/updates = |
Latest revision as of 10:47, 22 February 2023
Under Construction
RC Meeting Information
RC Daily Meetings are at 11:00 (am) via Zoom and in person in the counting house meeting room (2nd floor)
- Zoom remote connection information:
Join ZoomGov Meeting https://jlab-org.zoomgov.com/j/1607100885?pwd=ZFBsRTFsYm5Zb0laZ0tyZXNjcEE0QT09 Meeting ID: 160 710 0885 Passcode: 595071 One tap mobile +16692545252,,1607100885# US (San Jose) +16468287666,,1607100885# US (New York) Dial by your location +1 669 254 5252 US (San Jose) +1 646 828 7666 US (New York) +1 669 216 1590 US (San Jose) +1 551 285 1373 US 833 568 8864 US Toll-free Meeting ID: 160 710 0885 Find your local number: https://jlab-org.zoomgov.com/u/ab2CekLXgQ
Useful Links
Summary
- finished closing the hall about 4 pm
- set spectrometers to CAFE kinematics
- checked beam with harp scans and hole target
- checked and adjusted coincidence trigger with LH2 target
- took carbon "mean field" data
- ~10: 30 am moved to gold target
Current Status
- taking data on Au target in MF kinematic
Current Run Plan
- continue taking data on Au for MF and SRC kinematic until Friday morning or statistics achieved.
Issues/updates
- LH2 loop has a problematic fan motor controller; dumps too much power into target; current limited to ~ 20 uA; probably need to warm up LH2 before accepting 40 uA on LD2
Current Issues
Planned Accesses to the Hall
- none planned; will the LH2 warmup require an access?