Difference between revisions of "September 29, 2023"

From HallCWiki
Jump to: navigation, search
(Created page with "= RC Meeting Information = Current RC: Iuliia Skorodumina <b> RC Daily Meetings are at 11:00 (am) via Zoom and in person in the counting house meeting room (2nd floor) </b>...")
 
 
(3 intermediate revisions by the same user not shown)
Line 1: Line 1:
 +
[https://hallcweb.jlab.org/wiki/index.php/RC_Daily_Meetings:_NPS Back to the calendar]
 
= RC Meeting Information =
 
= RC Meeting Information =
  
Line 13: Line 14:
 
= Useful Links =
 
= Useful Links =
  
* [https://misportal.jlab.org/mis/physics/shiftSchedule/index.cfm?experimentRunId=HALLC-XEM2 Shift Signup ('''Read only''')]
+
* [https://misportal.jlab.org/mis/physics/shiftSchedule/index.cfm?experimentRunId=DVCS-NPS-2023 Shift Signup ('''Read only''')]
** [https://misportal.jlab.org/mis/apps/physics/shiftSchedule/index.cfm?experimentRunId=HALLC-XEM2 Shift Signup]
+
  
 
* [https://hallcweb.jlab.org/live_status/snapshots_controls/ Hall-C Controls]
 
* [https://hallcweb.jlab.org/live_status/snapshots_controls/ Hall-C Controls]
 
* [https://logbooks.jlab.org/book/hallc Hall-C Logbook]
 
* [https://logbooks.jlab.org/book/hallc Hall-C Logbook]
 
* [https://cebaf.jlab.org/files/ops/accboard/ MCC White Board]
 
* [https://cebaf.jlab.org/files/ops/accboard/ MCC White Board]
 
  
 
= Summary =
 
= Summary =
  
We did not have beam Thursday Day as the the accelerator was still troubleshooting issues with the BSY PSS controls (https://logbooks.jlab.org/entry/4189049).
+
We did not have beam '''Thursday Day''' as the the accelerator was still troubleshooting issues with the BSY PSS controls (https://logbooks.jlab.org/entry/4189049).
  
We got beam late Swing, followed the beam checkout procedure and proceeded to the third and last elastic setting (https://logbooks.jlab.org/entry/4188925).
+
We got beam late '''Swing''', followed the beam checkout procedure and proceeded to the third and last elastic setting (https://logbooks.jlab.org/entry/4188925).
 
   
 
   
When we resumed data taking, it became apparent that there is a dead channel in the NPS calorimeter (https://logbooks.jlab.org/entry/4189069), so it was decided to make a quick access to repair the channel. The repair took longer than expected and wasn't successful, so the problem still persists (https://logbooks.jlab.org/entry/4189167). Our attempts to fix the channel overlapped with the accelerator issues, so the beam was not available for the rest of the Owl shift (https://logbooks.jlab.org/entry/4189087).
+
When we resumed data taking, it became apparent that there is a dead channel in the NPS calorimeter (https://logbooks.jlab.org/entry/4189069), so it was decided to make a quick access to repair the channel. The repair took longer than expected and wasn't successful, so the problem still persists (https://logbooks.jlab.org/entry/4189167). Our attempts to fix the channel overlapped with the accelerator issues, so the beam was not available for the rest of the '''Owl''' shift (https://logbooks.jlab.org/entry/4189087).
  
 
Overnight we took about a half of our last elastic setting. Taking into account that we still need to take the rest of the elastic data and that the dead NPS channels have to be repaired, it was decided to reschedule the move of the calorimeter to Monday (https://logbooks.jlab.org/entry/4189173). Today we will fix the NPS channels, then take the rest of the elastic data, and then proceed with the KinC-x50-2 optics data (Sweep Magnet off and on) (less than 2 PAC shifts). We will take additional elastic data as time permits.
 
Overnight we took about a half of our last elastic setting. Taking into account that we still need to take the rest of the elastic data and that the dead NPS channels have to be repaired, it was decided to reschedule the move of the calorimeter to Monday (https://logbooks.jlab.org/entry/4189173). Today we will fix the NPS channels, then take the rest of the elastic data, and then proceed with the KinC-x50-2 optics data (Sweep Magnet off and on) (less than 2 PAC shifts). We will take additional elastic data as time permits.

Latest revision as of 09:17, 3 October 2023

Back to the calendar

RC Meeting Information

Current RC: Iuliia Skorodumina

RC Daily Meetings are at 11:00 (am) via Zoom and in person in the counting house meeting room (2nd floor)

Zoom remote connection information:
Join ZoomGov Meeting
https://jlab-org.zoomgov.com/j/1617015555?pwd=L09IQ216dml6ZmM5ODExVjFsMX
Meeting ID: 161 701 5555
Passcode: 288953

Useful Links

Summary

We did not have beam Thursday Day as the the accelerator was still troubleshooting issues with the BSY PSS controls (https://logbooks.jlab.org/entry/4189049).

We got beam late Swing, followed the beam checkout procedure and proceeded to the third and last elastic setting (https://logbooks.jlab.org/entry/4188925).

When we resumed data taking, it became apparent that there is a dead channel in the NPS calorimeter (https://logbooks.jlab.org/entry/4189069), so it was decided to make a quick access to repair the channel. The repair took longer than expected and wasn't successful, so the problem still persists (https://logbooks.jlab.org/entry/4189167). Our attempts to fix the channel overlapped with the accelerator issues, so the beam was not available for the rest of the Owl shift (https://logbooks.jlab.org/entry/4189087).

Overnight we took about a half of our last elastic setting. Taking into account that we still need to take the rest of the elastic data and that the dead NPS channels have to be repaired, it was decided to reschedule the move of the calorimeter to Monday (https://logbooks.jlab.org/entry/4189173). Today we will fix the NPS channels, then take the rest of the elastic data, and then proceed with the KinC-x50-2 optics data (Sweep Magnet off and on) (less than 2 PAC shifts). We will take additional elastic data as time permits.

Currently the Hall is in Controlled access.

Let's have an RC meeting today at 11 a.m.


Planned Accesses to the Hall

Hall is in Controlled access to repair the dead NPS channels.