Difference between revisions of "October 26, 2023"
From HallCWiki
Jump to navigationJump to search(5 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
− | = RC Meeting Information = | + | = RC Meeting Information =https://hallcweb.jlab.org/wiki/index.php?title=October_26,_2023&action=edit |
<b> RC Daily Meetings are at 11:00 (am) via Zoom and in person in the counting house meeting room (2nd floor) </b> | <b> RC Daily Meetings are at 11:00 (am) via Zoom and in person in the counting house meeting room (2nd floor) </b> | ||
Line 27: | Line 27: | ||
* [https://logbooks.jlab.org/book/hallc Hall-C Logbook] | * [https://logbooks.jlab.org/book/hallc Hall-C Logbook] | ||
* [https://cebaf.jlab.org/files/ops/accboard/ MCC White Board] | * [https://cebaf.jlab.org/files/ops/accboard/ MCC White Board] | ||
+ | |||
+ | = Past 24 hours = | ||
+ | |||
+ | Items addressed from our side inside of the Hall: | ||
+ | * Heidi replaced an N2 pressure sensor. Thermal hotspot Camera was checked? | ||
+ | * Jerry and others worked on the pump on top of the HMS | ||
+ | * Ellen went into the hall to check various cryocomponents. | ||
+ | * AC work in the CH completed | ||
+ | |||
+ | Items addressed from our side of the Hall: | ||
+ | * Alex and Hanjie completed the DAQ computer transfer, the DAQ was verified with LED data taking. The 50k replay script works. Alex is confident with a 10% higher current. | ||
+ | * Bob worked on the scaler. | ||
+ | * Bill Henry worked on repairing the alarm handler. (Starting the DAQ no longer generates the warning on the alarm handler.) | ||
+ | * Peter verified the new changes for the hcana, message to Mark: "Please go ahead and commit the changes". | ||
= Current Status = | = Current Status = | ||
Line 33: | Line 47: | ||
= Current Run Plan = | = Current Run Plan = | ||
+ | * Half wave plane change at 11 a.m. | ||
+ | * Moller measurement starting 8:30 a.m., last Friday for the day shift. | ||
− | = | + | = Issues = |
* Newly failed NPS modules: https://logbooks.jlab.org/entry/4209099 | * Newly failed NPS modules: https://logbooks.jlab.org/entry/4209099 | ||
* NPS LV due to the broken PMTs in column 2: https://logbooks.jlab.org/entry/4209048 | * NPS LV due to the broken PMTs in column 2: https://logbooks.jlab.org/entry/4209048 | ||
Line 44: | Line 60: | ||
= Planned Accelerator Configuration Changes = | = Planned Accelerator Configuration Changes = | ||
− | * Pass change in Hall A on the | + | * Pass change in Hall A on the 31th |
= Special Requests = | = Special Requests = | ||
− |
Latest revision as of 09:51, 26 October 2023
= RC Meeting Information =https://hallcweb.jlab.org/wiki/index.php?title=October_26,_2023&action=edit
RC Daily Meetings are at 11:00 (am) via Zoom and in person in the counting house meeting room (2nd floor)
- Zoom remote connection information:
Join ZoomGov Meeting https://jlab-org.zoomgov.com/j/1607100885?pwd=ZFBsRTFsYm5Zb0laZ0tyZXNjcEE0QT09 Meeting ID: 160 710 0885 Passcode: 595071 One tap mobile +16692545252,,1607100885# US (San Jose) +16468287666,,1607100885# US (New York) Dial by your location +1 669 254 5252 US (San Jose) +1 646 828 7666 US (New York) +1 669 216 1590 US (San Jose) +1 551 285 1373 US 833 568 8864 US Toll-free Meeting ID: 160 710 0885 Find your local number: https://jlab-org.zoomgov.com/u/ab2CekLXgQ
Useful Links
Past 24 hours
Items addressed from our side inside of the Hall:
- Heidi replaced an N2 pressure sensor. Thermal hotspot Camera was checked?
- Jerry and others worked on the pump on top of the HMS
- Ellen went into the hall to check various cryocomponents.
- AC work in the CH completed
Items addressed from our side of the Hall:
- Alex and Hanjie completed the DAQ computer transfer, the DAQ was verified with LED data taking. The 50k replay script works. Alex is confident with a 10% higher current.
- Bob worked on the scaler.
- Bill Henry worked on repairing the alarm handler. (Starting the DAQ no longer generates the warning on the alarm handler.)
- Peter verified the new changes for the hcana, message to Mark: "Please go ahead and commit the changes".
Current Status
- Continue production
- RC summary: https://logbooks.jlab.org/entry/4209118
Current Run Plan
- Half wave plane change at 11 a.m.
- Moller measurement starting 8:30 a.m., last Friday for the day shift.
Issues
- Newly failed NPS modules: https://logbooks.jlab.org/entry/4209099
- NPS LV due to the broken PMTs in column 2: https://logbooks.jlab.org/entry/4209048
- Lost communication with the raster IOC: https://logbooks.jlab.org/entry/4208767
- Alarm handler no warning? https://logbooks.jlab.org/entry/4209113
- Sieve got stuck: https://logbooks.jlab.org/entry/4209150
Planned Accesses to the Hall Today
Planned Accelerator Configuration Changes
- Pass change in Hall A on the 31th