Difference between revisions of "Analysis Task List"

From HallCWiki
Jump to: navigation, search
(Analysis Task List)
 
(10 intermediate revisions by the same user not shown)
Line 8: Line 8:
 
deuteron analysis ELOG: https://hallcweb.jlab.org/elogs/deuteron/
 
deuteron analysis ELOG: https://hallcweb.jlab.org/elogs/deuteron/
  
== General Analysis Task List ==
+
== Analysis Task List ==
 
{| class="wikitable" style="margin:auto"
 
{| class="wikitable" style="margin:auto"
|+ Caption text
+
|+ Tasks to be completed.
 
|-
 
|-
! Task !! Deadline !! STATUS
+
! Task !! Deadline !! STATUS !! Responsible Personnel !! HC-LOG !! HC-DocDB
 
|-
 
|-
| Example || Example || Example
+
| Set Reference Times || MM/DD/YY || ! style="color:orange" | IN-PROGRESS || G. Villegas
 
|-
 
|-
| Example || Example || Example
+
| Set Detector Time Window Cuts || MM/DD/YY || ! style="color:orange" | IN-PROGRESS || G. Villegas
 +
|-
 +
| Detector Calibrations || MM/DD/YY || ! style="color:red" | PENDING || G. Villegas
 +
|-
 +
| target boiling studies || MM/DD/YY || ! style="color:red" | PENDING || G. Villegas
 +
|-
 +
| proton absorption studies || MM/DD/YY || ! style="color:red" | PENDING || G. Villegas
 
|-
 
|-
| Example || Example || Example
+
| h(e,e'p) check / alignment / optimization || MM/DD/YY || ! style="color:red" | PENDING || G. Villegas
 +
|-
 +
| d(e,e'p) low-pmiss setting check  || MM/DD/YY || ! style="color:red" | PENDING || G. Villegas
 +
 
 
|}
 
|}

Latest revision as of 10:57, 3 November 2023

The d(e,e'p) experiment (E12-10-003) Offline Analysis Task lists page is used to keep track of the general and specialized tasks required to complete the data analysis.

Once each specified task is completed, the work done must be summarized in a slide presentation and uploaded to the deuteron analysis ELOG.

deuteron analysis ELOG: https://hallcweb.jlab.org/elogs/deuteron/

Analysis Task List

Tasks to be completed.
Task Deadline STATUS Responsible Personnel HC-LOG HC-DocDB
Set Reference Times MM/DD/YY IN-PROGRESS G. Villegas
Set Detector Time Window Cuts MM/DD/YY IN-PROGRESS G. Villegas
Detector Calibrations MM/DD/YY PENDING G. Villegas
target boiling studies MM/DD/YY PENDING G. Villegas
proton absorption studies MM/DD/YY PENDING G. Villegas
h(e,e'p) check / alignment / optimization MM/DD/YY PENDING G. Villegas
d(e,e'p) low-pmiss setting check MM/DD/YY PENDING G. Villegas