Difference between revisions of "Analysis Task List"
From HallCWiki
Jump to navigationJump to search(7 intermediate revisions by the same user not shown) | |||
Line 8: | Line 8: | ||
deuteron analysis ELOG: https://hallcweb.jlab.org/elogs/deuteron/ | deuteron analysis ELOG: https://hallcweb.jlab.org/elogs/deuteron/ | ||
− | == | + | == Analysis Task List == |
{| class="wikitable" style="margin:auto" | {| class="wikitable" style="margin:auto" | ||
− | |+ | + | |+ Tasks to be completed. |
|- | |- | ||
− | ! Task !! Deadline !! STATUS !! Responsible Personnel | + | ! Task !! Deadline !! STATUS !! Responsible Personnel !! HC-LOG !! HC-DocDB |
|- | |- | ||
| Set Reference Times || MM/DD/YY || ! style="color:orange" | IN-PROGRESS || G. Villegas | | Set Reference Times || MM/DD/YY || ! style="color:orange" | IN-PROGRESS || G. Villegas | ||
|- | |- | ||
− | | Set Detector Time Window Cuts || MM/DD/YY || IN-PROGRESS || G. Villegas | + | | Set Detector Time Window Cuts || MM/DD/YY || ! style="color:orange" | IN-PROGRESS || G. Villegas |
|- | |- | ||
− | | Detector Calibrations || MM/DD/YY || PENDING || G. Villegas | + | | Detector Calibrations || MM/DD/YY || ! style="color:red" | PENDING || G. Villegas |
+ | |- | ||
+ | | target boiling studies || MM/DD/YY || ! style="color:red" | PENDING || G. Villegas | ||
+ | |- | ||
+ | | proton absorption studies || MM/DD/YY || ! style="color:red" | PENDING || G. Villegas | ||
+ | |- | ||
+ | | h(e,e'p) check / alignment / optimization || MM/DD/YY || ! style="color:red" | PENDING || G. Villegas | ||
+ | |- | ||
+ | | d(e,e'p) low-pmiss setting check || MM/DD/YY || ! style="color:red" | PENDING || G. Villegas | ||
+ | |||
|} | |} |
Latest revision as of 09:57, 3 November 2023
The d(e,e'p) experiment (E12-10-003) Offline Analysis Task lists page is used to keep track of the general and specialized tasks required to complete the data analysis.
Once each specified task is completed, the work done must be summarized in a slide presentation and uploaded to the deuteron analysis ELOG.
deuteron analysis ELOG: https://hallcweb.jlab.org/elogs/deuteron/
Analysis Task List
Task | Deadline | STATUS | Responsible Personnel | HC-LOG | HC-DocDB |
---|---|---|---|---|---|
Set Reference Times | MM/DD/YY | IN-PROGRESS | G. Villegas | ||
Set Detector Time Window Cuts | MM/DD/YY | IN-PROGRESS | G. Villegas | ||
Detector Calibrations | MM/DD/YY | PENDING | G. Villegas | ||
target boiling studies | MM/DD/YY | PENDING | G. Villegas | ||
proton absorption studies | MM/DD/YY | PENDING | G. Villegas | ||
h(e,e'p) check / alignment / optimization | MM/DD/YY | PENDING | G. Villegas | ||
d(e,e'p) low-pmiss setting check | MM/DD/YY | PENDING | G. Villegas |