Difference between revisions of "December 7, 2023"

From HallCWiki
Jump to navigationJump to search
 
(One intermediate revision by the same user not shown)
Line 31: Line 31:
 
** cc Heidi on any cryo logbook entry (fansler@jlab.org)
 
** cc Heidi on any cryo logbook entry (fansler@jlab.org)
 
* Physically verify green led of gas flow and BCM temps in electronics room
 
* Physically verify green led of gas flow and BCM temps in electronics room
 +
* Restore "Empty Water from Coffee Machine" to Shift Checklist (and do this!)
 +
* Record data rate (MBy/sec ) for each new run/config
 +
* Shift Leader:  Record HMS (electron) tracking efficiency from each 50K replay report
  
 
= Current Issues =
 
= Current Issues =
Line 36: Line 39:
 
* We need other indications of this interlock. In Hall A, we have it shut off detector HV via the alarm handler, and we have a flow rate alarm. Seems the useful PV values have not been working since 1-Sept.
 
* We need other indications of this interlock. In Hall A, we have it shut off detector HV via the alarm handler, and we have a flow rate alarm. Seems the useful PV values have not been working since 1-Sept.
 
* NPS PMT/Base failures are propagating into columns 9 & 10
 
* NPS PMT/Base failures are propagating into columns 9 & 10
 +
 +
  
 
= Planned Access to the Hall =
 
= Planned Access to the Hall =
Line 41: Line 46:
  
 
= Planned Accelerator Configuration Changes =
 
= Planned Accelerator Configuration Changes =
*  
+
* We will run until 07:00 Dec 15.
 +
** Target will be warmed up and parked.
 +
** Hall will remain in Controlled Access until 07:00 Dec 19
 +
** Beam studies (Day Shift) Dec 19 will send beam into hall
  
 
= Special Requests =
 
= Special Requests =
 
*
 
*

Latest revision as of 10:36, 7 December 2023

RC Meeting Information

RC Daily Meetings are at 11:00 (am) via Zoom and in person in the counting house meeting room (2nd floor)

Useful Links

Current Status

  • Moller Measurement yesterday, polarization = 86%
    • Beam recovery after Moller (mostly) smooth
    • Required MCC to reboot an ioc. This caused reboot of MCC ioc's
    • HMS Chamber 2V1 recovery slow (lingering structure in drift distance plot)
      • Chose to take 2 hour cosmic
    • Returned to run plan on LD2


Current Run Plan

Notices in Effect for Shift Crew

  • All shifts should come in as planned.
  • Heidi on vacation 7-13 Dec. Contact Steve L for cryo during that time.
    • cc Heidi on any cryo logbook entry (fansler@jlab.org)
  • Physically verify green led of gas flow and BCM temps in electronics room
  • Restore "Empty Water from Coffee Machine" to Shift Checklist (and do this!)
  • Record data rate (MBy/sec ) for each new run/config
  • Shift Leader: Record HMS (electron) tracking efficiency from each 50K replay report

Current Issues

  • On call list seems incomplete and should be addressed by the Hall: https://logbooks.jlab.org/entry/4230495
  • We need other indications of this interlock. In Hall A, we have it shut off detector HV via the alarm handler, and we have a flow rate alarm. Seems the useful PV values have not been working since 1-Sept.
  • NPS PMT/Base failures are propagating into columns 9 & 10


Planned Access to the Hall

Planned Accelerator Configuration Changes

  • We will run until 07:00 Dec 15.
    • Target will be warmed up and parked.
    • Hall will remain in Controlled Access until 07:00 Dec 19
    • Beam studies (Day Shift) Dec 19 will send beam into hall

Special Requests