Line 41: Line 41:
 
* We need other indications of this interlock. In Hall A, we have it shut off detector HV via the alarm handler, and we have a flow rate alarm. Seems the useful PV values have not been working since 1-Sept.
 
* We need other indications of this interlock. In Hall A, we have it shut off detector HV via the alarm handler, and we have a flow rate alarm. Seems the useful PV values have not been working since 1-Sept.
 
* NPS PMT/Base failures are propagating into columns 9, 10, 11
 
* NPS PMT/Base failures are propagating into columns 9, 10, 11
 +
** https://logbooks.jlab.org/files/2023/12/4231574/nps_hms_coin_3454_50k.pdf
 
* 10:25 Beam off for cryo escorted access to track down ~700 (liquid) litre/day He loss
 
* 10:25 Beam off for cryo escorted access to track down ~700 (liquid) litre/day He loss
 +
** https://logbooks.jlab.org/entry/4231581
  
  
Line 56: Line 58:
  
 
= Special Requests =
 
= Special Requests =
*
+
* Plan for Moller Dec 13 or 14 (single HWP setting)

Latest revision as of 11:35, 8 December 2023

RC Meeting Information

RC Daily Meetings are at 11:00 (am) via Zoom and in person in the counting house meeting room (2nd floor)

Useful Links

Current Status

  • HMS Chamber 2V1 looks ok now (verify efficiencies in 50K reports)
  • Production on KinC_x50_2 and _2'
    • High Q2 ==> HMS singles rates are low,
      • Coincidence event rates are low (~500 Hz)
      • Data Rates << 100 MBy/sec
    • NPS singles rates are moderate to high
      • KinC_x50_2 @ 30 uA hTRIG1 = 1 MHz
  • Yesterday tried for 36 uA on LH2 at KinC_x50_2
    • Bailed out after approx 1 hour of MCC tuning
    • At 8:00 am meeting, Crew Chief offered to try again for 36 uA, but did not promise less than 1 hour tuning.
    • Decided to stay at max 30 uA running for weekend

Current Run Plan

Notices in Effect for Shift Crew

  • All shifts should come in as planned.
  • Heidi on vacation 7-13 Dec. Contact Steve L for cryo during that time.
    • cc Heidi on any cryo logbook entry (fansler@jlab.org)
  • Physically verify green led of gas flow and BCM temps in electronics room
  • Shift Leader: Record HMS (electron) tracking efficiency from each 50K replay report

Current Issues


Planned Access to the Hall

Planned Accelerator Configuration Changes

  • We will run until 07:00 Dec 15.
    • Target will be warmed up and parked.
    • Hall will remain in Controlled Access until 07:00 Dec 19
    • Beam studies (Day Shift) Dec 19 will send beam into hall
    • Hall will return to Controlled Access at 16:00 on Dec 19

Special Requests

  • Plan for Moller Dec 13 or 14 (single HWP setting)