Line 19: | Line 19: | ||
* DIS singles data for LH2, LD2, Dummy. Carbon data need to be taken before switching to the Positron data taking | * DIS singles data for LH2, LD2, Dummy. Carbon data need to be taken before switching to the Positron data taking | ||
* BCM calibrations: | * BCM calibrations: | ||
+ | ** Plan: [https://hallcweb.jlab.org/wiki/images/1/1a/BCMCalib_02272024.pdf] | ||
** https://logbooks.jlab.org/entry/4257267 (Faraday cup measurments) | ** https://logbooks.jlab.org/entry/4257267 (Faraday cup measurments) | ||
** https://logbooks.jlab.org/entry/4257273 (BCM calibrations) | ** https://logbooks.jlab.org/entry/4257273 (BCM calibrations) | ||
+ | * Took 2x30min LH2 data at 16uA | ||
+ | ** Could we increase the LH2 production to 16uA? | ||
* Completed second production data cycle (first one with 8uA on LD2) | * Completed second production data cycle (first one with 8uA on LD2) | ||
+ | |||
* NPS crate temperatures: | * NPS crate temperatures: | ||
Line 30: | Line 34: | ||
** SHMS hut temperature sensor to be replaced on Wed during the access | ** SHMS hut temperature sensor to be replaced on Wed during the access | ||
** Hall temperature reading frozen: https://logbooks.jlab.org/entry/4257295 | ** Hall temperature reading frozen: https://logbooks.jlab.org/entry/4257295 | ||
− | + | ** Ben will add FPGA temperature readings to DAQ info | |
= Accelerator status = | = Accelerator status = | ||
Line 40: | Line 44: | ||
** Beam to the halls, ~22:30pm | ** Beam to the halls, ~22:30pm | ||
** Scheduled can be shifted a bit if the maintenance work finished earlier | ** Scheduled can be shifted a bit if the maintenance work finished earlier | ||
+ | |||
+ | = Planned Access to the Hall = | ||
+ | |||
+ | Controlled access. RadCon full survey starts around 9am. | ||
+ | |||
+ | * NPS: Julie, Josh, Aaron to look at the temperature read back issue (3 keys almost whole access?) | ||
+ | * Walk-thru at 1pm: Joe + 5 FIU students (6 keys) | ||
+ | * Heidi: checking Dipole, needs one hour | ||
+ | * Bill: SHMS hut temperature sensor replacement | ||
= Current Run Plan = | = Current Run Plan = | ||
* Short-term run plan: https://hallcweb.jlab.org/wiki/index.php/Short_Term_Run-Plan | * Short-term run plan: https://hallcweb.jlab.org/wiki/index.php/Short_Term_Run-Plan | ||
** KinC_x36_6, NPS at 7.5 deg, calorimeter at 6m | ** KinC_x36_6, NPS at 7.5 deg, calorimeter at 6m | ||
− | ** Positron data taking | + | ** Remaining Carbon DIS data taking at 13:00pm today |
+ | ** Followed by Positron data taking, until tomorrow 7am | ||
** Moller measurements on Thursday? | ** Moller measurements on Thursday? | ||
= Notices in Effect for Shift Crew = | = Notices in Effect for Shift Crew = | ||
* IHWP change instruction: https://hallcweb.jlab.org/wiki/index.php/Hall_C_IHWP_Change_Procedure | * IHWP change instruction: https://hallcweb.jlab.org/wiki/index.php/Hall_C_IHWP_Change_Procedure | ||
+ | * BTA with low current - https://logbooks.jlab.org/entry/4256075 | ||
+ | ** Helper script: go_bta_config | ||
= Current Issues = | = Current Issues = | ||
Line 54: | Line 70: | ||
** Not much reported recently, taking 30min runs (restarting a new run more often) seems helping | ** Not much reported recently, taking 30min runs (restarting a new run more often) seems helping | ||
* NPS crate temperatures | * NPS crate temperatures | ||
− | |||
− | |||
= Special Requests = | = Special Requests = | ||
* Guard house work till Friday. Pay attention to the sign and follow the directions around there when coming to the accelerator site. | * Guard house work till Friday. Pay attention to the sign and follow the directions around there when coming to the accelerator site. |
Latest revision as of 10:31, 27 February 2024
RC Meeting Information
RC Daily Meetings are at 11:00 (am) via Zoom and in person in the counting house meeting room (2nd floor)
- Zoom connection link: https://jlab-org.zoomgov.com/j/1617015555?pwd=L09IQ216dml6ZmM5ODExVjFsMX
- Meeting ID: 161 701 5555
- Passcode: 288953
Useful Links
Hall status
- DIS singles data for LH2, LD2, Dummy. Carbon data need to be taken before switching to the Positron data taking
- BCM calibrations:
- Plan: [1]
- https://logbooks.jlab.org/entry/4257267 (Faraday cup measurments)
- https://logbooks.jlab.org/entry/4257273 (BCM calibrations)
- Took 2x30min LH2 data at 16uA
- Could we increase the LH2 production to 16uA?
- Completed second production data cycle (first one with 8uA on LD2)
- NPS crate temperatures:
- Bill added them to MUNIN: https://hallcweb.jlab.org/munin/crates_det-day.html
- Temperature readings around ~95F for crate #4
- Escorted access: Confirmed AC working, Placed box fans for crate #2 and #4 (https://logbooks.jlab.org/entry/4257294)
- Asked facilities to set AC from 68F -> 65F
- SHMS hut temperature sensor to be replaced on Wed during the access
- Hall temperature reading frozen: https://logbooks.jlab.org/entry/4257295
- Ben will add FPGA temperature readings to DAQ info
Accelerator status
- West arc box supplies dropped off at 7am, downtime for ~2.5h
- Maintenance + Beam study on Wednesday
- Beam off at 7am
- Maintenance till around noon
- Beam study till 21:00pm
- Beam to the halls, ~22:30pm
- Scheduled can be shifted a bit if the maintenance work finished earlier
Planned Access to the Hall
Controlled access. RadCon full survey starts around 9am.
- NPS: Julie, Josh, Aaron to look at the temperature read back issue (3 keys almost whole access?)
- Walk-thru at 1pm: Joe + 5 FIU students (6 keys)
- Heidi: checking Dipole, needs one hour
- Bill: SHMS hut temperature sensor replacement
Current Run Plan
- Short-term run plan: https://hallcweb.jlab.org/wiki/index.php/Short_Term_Run-Plan
- KinC_x36_6, NPS at 7.5 deg, calorimeter at 6m
- Remaining Carbon DIS data taking at 13:00pm today
- Followed by Positron data taking, until tomorrow 7am
- Moller measurements on Thursday?
Notices in Effect for Shift Crew
- IHWP change instruction: https://hallcweb.jlab.org/wiki/index.php/Hall_C_IHWP_Change_Procedure
- BTA with low current - https://logbooks.jlab.org/entry/4256075
- Helper script: go_bta_config
Current Issues
- NPS crate #2 drops occasionally
- Not much reported recently, taking 30min runs (restarting a new run more often) seems helping
- NPS crate temperatures
Special Requests
- Guard house work till Friday. Pay attention to the sign and follow the directions around there when coming to the accelerator site.