= Summary = | = Summary = | ||
− | Yesterday was the Maintenance Day during the Day shift (https://logbooks.jlab.org/entry/4258304) and during Swing accelerator did some beam studies (https://logbooks.jlab.org/entry/4258458). The beam was restored to the Halls late Swing and we proceeded back to production. We took Dummy runs and then switched to LD2 for the night. Hall B performed the Moller measurements at the end of the Swing shift and then changed IHWP from OUT to IN, after which we ran the flipper script. | + | '''Yesterday (02/28)''' was the Maintenance Day during the '''Day shift''' (https://logbooks.jlab.org/entry/4258304) and during '''Swing''' accelerator did some beam studies (https://logbooks.jlab.org/entry/4258458). The beam was restored to the Halls late '''Swing''' and we proceeded back to production. We took Dummy runs and then switched to LD2 for the night. Hall B performed the Moller measurements at the end of the '''Swing shift''' and then changed IHWP from OUT to IN, after which we ran the flipper script. |
We are currently at KinC_x36_6 (NPS Calorimeter at 6.0 m) and going to stay at this kinematics for the next few days. Data taking was smooth overnight without major issues. | We are currently at KinC_x36_6 (NPS Calorimeter at 6.0 m) and going to stay at this kinematics for the next few days. Data taking was smooth overnight without major issues. | ||
Swing shift summary (https://logbooks.jlab.org/entry/4258334). | Swing shift summary (https://logbooks.jlab.org/entry/4258334). | ||
+ | |||
Owl shift summary (https://logbooks.jlab.org/entry/4258486). | Owl shift summary (https://logbooks.jlab.org/entry/4258486). | ||
+ | |||
+ | We will have an RC meeting today at 11 a.m. | ||
= Planned Access to the Hall = | = Planned Access to the Hall = | ||
− | Julie wants to make an access | + | Julie wants to make an access to repair two NPS channels. The hall survey is scheduled for 1pm. |
+ | |||
+ | = Accelerator = | ||
+ | |||
+ | RF would like to do two things this afternoon to zone 1L24. Replace the HPA controller and a solenoid controller. Both jobs can occur at the same time. Estimate is ~2hrs, including recovering the energy but could be less. Currently the North Linac trip rate is 28 trips/shift. Recovering the two cavities should take it down to 18-16 trips/shift. The work is planned to start at ~1:30pm-2:00pm. | ||
= Current Run Plan = | = Current Run Plan = | ||
Line 38: | Line 45: | ||
* NPS position for the next kinematics setting: | * NPS position for the next kinematics setting: | ||
** 5m vs 6m: https://logbooks.jlab.org/entry/4258150 | ** 5m vs 6m: https://logbooks.jlab.org/entry/4258150 | ||
− | |||
= Current Issues = | = Current Issues = | ||
− | * NPS | + | * Hanjie was concerned that some NPS crates have relatively higher fan temperatures (~95F). We put box fans for those crates. We also asked Facilities if they can lower the AC set point from 68F to 65F (was done yesterday). |
+ | |||
+ | = Future plans = | ||
+ | * Monday (03/04): Sweeper wings off (Walter). | ||
+ | * Monday (03/04): Spectrometer rotations: To be done after taking the Wings off. HMS-SHMS separation needs to be certified in the hall (Steve L). | ||
+ | * Moller measurement next week (probably Tuesday) |
Latest revision as of 11:10, 29 February 2024
RC Meeting Information
Current RC: Iuliia Skorodumina
RC Daily Meetings are at 11:00 (am) via Zoom and in person in the counting house meeting room (2nd floor)
- Zoom connection link: https://jlab-org.zoomgov.com/j/1617015555?pwd=L09IQ216dml6ZmM5ODExVjFsMX
- Meeting ID: 161 701 5555
- Passcode: 288953
Useful Links
Summary
Yesterday (02/28) was the Maintenance Day during the Day shift (https://logbooks.jlab.org/entry/4258304) and during Swing accelerator did some beam studies (https://logbooks.jlab.org/entry/4258458). The beam was restored to the Halls late Swing and we proceeded back to production. We took Dummy runs and then switched to LD2 for the night. Hall B performed the Moller measurements at the end of the Swing shift and then changed IHWP from OUT to IN, after which we ran the flipper script.
We are currently at KinC_x36_6 (NPS Calorimeter at 6.0 m) and going to stay at this kinematics for the next few days. Data taking was smooth overnight without major issues.
Swing shift summary (https://logbooks.jlab.org/entry/4258334).
Owl shift summary (https://logbooks.jlab.org/entry/4258486).
We will have an RC meeting today at 11 a.m.
Planned Access to the Hall
Julie wants to make an access to repair two NPS channels. The hall survey is scheduled for 1pm.
Accelerator
RF would like to do two things this afternoon to zone 1L24. Replace the HPA controller and a solenoid controller. Both jobs can occur at the same time. Estimate is ~2hrs, including recovering the energy but could be less. Currently the North Linac trip rate is 28 trips/shift. Recovering the two cavities should take it down to 18-16 trips/shift. The work is planned to start at ~1:30pm-2:00pm.
Current Run Plan
- Short-term run plan: https://hallcweb.jlab.org/wiki/index.php/Short_Term_Run-Plan
- KinC_x36_6, NPS at 7.5 deg, calorimeter at 6m
- NPS position for the next kinematics setting:
- 5m vs 6m: https://logbooks.jlab.org/entry/4258150
Current Issues
- Hanjie was concerned that some NPS crates have relatively higher fan temperatures (~95F). We put box fans for those crates. We also asked Facilities if they can lower the AC set point from 68F to 65F (was done yesterday).
Future plans
- Monday (03/04): Sweeper wings off (Walter).
- Monday (03/04): Spectrometer rotations: To be done after taking the Wings off. HMS-SHMS separation needs to be certified in the hall (Steve L).
- Moller measurement next week (probably Tuesday)