Difference between revisions of "March 14, 2024"
From HallCWiki
Jump to navigationJump to search(One intermediate revision by the same user not shown) | |||
Line 2: | Line 2: | ||
= RC Meeting Information = | = RC Meeting Information = | ||
+ | Current RC: Rachel Montgomery (rmontgom@jlab.org) | ||
<b> RC Daily Meetings are at 11:00 (am) via Zoom and in person in the counting house meeting room (2nd floor) </b> | <b> RC Daily Meetings are at 11:00 (am) via Zoom and in person in the counting house meeting room (2nd floor) </b> | ||
Line 29: | Line 30: | ||
= Run Plan = | = Run Plan = | ||
− | * We are cycling KinC_x50_0a and KinC_x50_0b production | + | * We are cycling KinC_x50_0a and KinC_x50_0b production. We're on the first cycle of the KinC_x50_0 short term run plan. |
* We resumed production during swing 13th March on KinC_x50_0a - step 1.3 - LD2 target, and the 5th (of sixteen) 30min runs with 15uA, ps4=0. | * We resumed production during swing 13th March on KinC_x50_0a - step 1.3 - LD2 target, and the 5th (of sixteen) 30min runs with 15uA, ps4=0. | ||
* Since then the LD2 for KinC_x50_0a was completed and now the day shift crew are a few runs into the LH2 running for KinC_x50_0b | * Since then the LD2 for KinC_x50_0a was completed and now the day shift crew are a few runs into the LH2 running for KinC_x50_0b |
Latest revision as of 09:51, 19 March 2024
RC Meeting Information
Current RC: Rachel Montgomery (rmontgom@jlab.org)
RC Daily Meetings are at 11:00 (am) via Zoom and in person in the counting house meeting room (2nd floor)
- Zoom connection link: https://jlab-org.zoomgov.com/j/1617015555?pwd=L09IQ216dml6ZmM5ODExVjFsMX
- Meeting ID: 161 701 5555
- Passcode: 288953
Useful Links
- Short term run plan [1]
- Shift Signup (Read only)
- Hall-C Controls
- Hall-C Logbook
- MCC White Board
- Daily RC Reports
Summary
RC update 14th March: https://logbooks.jlab.org/entry/4266651
Planned Access to the Hall
Currently no planned access
Accelerator
Current schedule: Hall D stops running Friday Lunch time. Hall B then comes up. Next Wed 20th March is for beam studies.
Run Plan
- We are cycling KinC_x50_0a and KinC_x50_0b production. We're on the first cycle of the KinC_x50_0 short term run plan.
- We resumed production during swing 13th March on KinC_x50_0a - step 1.3 - LD2 target, and the 5th (of sixteen) 30min runs with 15uA, ps4=0.
- Since then the LD2 for KinC_x50_0a was completed and now the day shift crew are a few runs into the LH2 running for KinC_x50_0b
- How do we want to fit in positron runs (if needed)?
- Do we want to request some days worth of access to work on NPS?
Requests for shift crew
- Please be sure to make screen shots as prompted in the run plan, eg first run of each new target cycle snapshot NPS scalers/anode currents, trigger rates, CODA data rate/livetime/event rate, as prompted in the run plan and of anything else appropriate that happens on shift (e.g. NPS sweeper and corrector settings)
Shift schedule
Please sign up for swing SL this Sunday March 17th if you can. There are also gaps in SL in the days following that.