Difference between revisions of "March 22, 2024"
From HallCWiki
Jump to navigationJump to search (Created page with "= RC Meeting Information = Current RC: Michael Nycz (mnycz@jlab.org) <b> RC Daily Meetings are at 11:00 (am) via Zoom and in person in the counting house meeting room (2nd fl...") |
|||
(14 intermediate revisions by the same user not shown) | |||
Line 6: | Line 6: | ||
* Meeting ID: 161 701 5555 | * Meeting ID: 161 701 5555 | ||
* Passcode: 288953 | * Passcode: 288953 | ||
+ | |||
+ | = Useful Links = | ||
+ | |||
+ | * Short term run plan [https://hallcweb.jlab.org/wiki/index.php/Short_Term_Run-Plan] | ||
+ | * [https://misportal.jlab.org/mis/physics/shiftSchedule/index.cfm?experimentRunId=DVCS-NPS-2023 Shift Signup ('''Read only''')] | ||
+ | * [https://hallcweb.jlab.org/live_status/snapshots_controls/ Hall-C Controls] | ||
+ | * [https://logbooks.jlab.org/book/hallc Hall-C Logbook] | ||
+ | * [https://cebaf.jlab.org/files/ops/accboard/ MCC White Board] | ||
+ | * [https://hallcweb.jlab.org/wiki/index.php/RC_Daily_Meetings:_NPS Daily RC Reports] | ||
+ | |||
+ | = Summary = | ||
+ | *Yesterday, while attempting to bring us back to production, there was a vacuum issue in the NE spreading. | ||
+ | *have been down since ~11 am yesterday. Prior to the vacuum issue, the calorimeter was moved from 3 to 4 meters. Unfortunately, no data has been taken at this 4 meter setting. | ||
+ | *This morning, will move the calorimeter back to 3 meters in anticipation of the resumption of beam. | ||
+ | *While beam has down, a short access was made into the hall during the SWING shift. Module C3-R3 was replaced. | ||
+ | **A full summary of the activities can be found in Josh's logbook entry: https://logbooks.jlab.org/entry/4270285 | ||
+ | **LED runs were taken during OWL shift. | ||
+ | |||
+ | *Presently, work continues to address the vacuum issue. They expect to have a clearer idea about the timeline for resuming beam delivery around noon today, | ||
+ | |||
+ | *PMT bases surveyed and removed from the hall | ||
+ | |||
+ | = Planned Access to the Hall = | ||
+ | * 03/22/2024 - Move NPS to 3 meters: KinC_x50_0 / NPS = 14.40 deg (Completed) | ||
+ | |||
+ | = Possible plans while we wait for resumption of beam= | ||
+ | * LED (Magnet on & Magnet off) / Cosmics? | ||
+ | ** Alternate HV settings? | ||
+ | *Other suggestions? | ||
+ | |||
+ | = Future Plans = | ||
+ | * Current Kinematic: KinC_x50_0 | ||
+ | ** HMS angle = 25.940 deg, HMS Momentum = -2.638, SHMS angle = 30.700 deg (NPS Angle 14.400 deg) | ||
+ | * Proposed plan: Change kinematic setting on Saturday | ||
+ | * Tuesday (03/26): Moller measurement | ||
+ | |||
+ | = Miscellaneous= | ||
+ | * Site Office walkthrough ~ 15 - 30 minutes on Wednesday (will need to be out of the hall). | ||
+ | * Doug will try and coordinate to let us know the time so we can prepare | ||
+ | ==Shift schedule == | ||
+ | * Is beginning to fill up | ||
+ | ** TO Sunday OWL: Trade request | ||
+ | ** TO Sunday DAY: SL needs to have walkthrough (SAF112) | ||
+ | ** TO shift for OWL and SWING (Monday - Wednesday) |
Latest revision as of 09:41, 22 March 2024
RC Meeting Information
Current RC: Michael Nycz (mnycz@jlab.org)
RC Daily Meetings are at 11:00 (am) via Zoom and in person in the counting house meeting room (2nd floor)
- Zoom connection link: https://jlab-org.zoomgov.com/j/1617015555?pwd=L09IQ216dml6ZmM5ODExVjFsMX
- Meeting ID: 161 701 5555
- Passcode: 288953
Useful Links
- Short term run plan [1]
- Shift Signup (Read only)
- Hall-C Controls
- Hall-C Logbook
- MCC White Board
- Daily RC Reports
Summary
- Yesterday, while attempting to bring us back to production, there was a vacuum issue in the NE spreading.
- have been down since ~11 am yesterday. Prior to the vacuum issue, the calorimeter was moved from 3 to 4 meters. Unfortunately, no data has been taken at this 4 meter setting.
- This morning, will move the calorimeter back to 3 meters in anticipation of the resumption of beam.
- While beam has down, a short access was made into the hall during the SWING shift. Module C3-R3 was replaced.
- A full summary of the activities can be found in Josh's logbook entry: https://logbooks.jlab.org/entry/4270285
- LED runs were taken during OWL shift.
- Presently, work continues to address the vacuum issue. They expect to have a clearer idea about the timeline for resuming beam delivery around noon today,
- PMT bases surveyed and removed from the hall
Planned Access to the Hall
- 03/22/2024 - Move NPS to 3 meters: KinC_x50_0 / NPS = 14.40 deg (Completed)
Possible plans while we wait for resumption of beam
- LED (Magnet on & Magnet off) / Cosmics?
- Alternate HV settings?
- Other suggestions?
Future Plans
- Current Kinematic: KinC_x50_0
- HMS angle = 25.940 deg, HMS Momentum = -2.638, SHMS angle = 30.700 deg (NPS Angle 14.400 deg)
- Proposed plan: Change kinematic setting on Saturday
- Tuesday (03/26): Moller measurement
Miscellaneous
- Site Office walkthrough ~ 15 - 30 minutes on Wednesday (will need to be out of the hall).
- Doug will try and coordinate to let us know the time so we can prepare
Shift schedule
- Is beginning to fill up
- TO Sunday OWL: Trade request
- TO Sunday DAY: SL needs to have walkthrough (SAF112)
- TO shift for OWL and SWING (Monday - Wednesday)