Difference between revisions of "Elong-2016-06-02"
(New page: '''Title''' Measurements of the Quasi-Elastic and Elastic Deuteron Tensor Asymmetries '''Days Requested for Approval''' 34 Physics + 11 Overhead '''Experiment Halls *''' C '''Pr...) |
|||
Line 1: | Line 1: | ||
'''Title''' | '''Title''' | ||
+ | |||
Measurements of the Quasi-Elastic and Elastic Deuteron Tensor Asymmetries | Measurements of the Quasi-Elastic and Elastic Deuteron Tensor Asymmetries | ||
Line 10: | Line 11: | ||
'''Experiment Halls *''' | '''Experiment Halls *''' | ||
− | + | C | |
− | '''Proposal Physics Goals | + | '''Proposal Physics Goals |
Indicate any Experiments that have physics goals similar to those in your proposal. | Indicate any Experiments that have physics goals similar to those in your proposal. | ||
− | Approved, Conditionally Approved, and/or Deferred Experiment(s) or proposals. | + | Approved, Conditionally Approved, and/or Deferred Experiment(s) or proposals.''' |
PR97-102 | PR97-102 | ||
Line 28: | Line 29: | ||
N/A | N/A | ||
− | Key Experiment Parameters | + | |
+ | |||
+ | '''Key Experiment Parameters | ||
List Beam Energies and Beam Days: (e.g. 30 Days at 11 GeV, 20 Days at 8 GeV) | List Beam Energies and Beam Days: (e.g. 30 Days at 11 GeV, 20 Days at 8 GeV) | ||
+ | ''' | ||
32.6 Days at 8.8 GeV | 32.6 Days at 8.8 GeV | ||
10.4 Days at 6.6 GeV | 10.4 Days at 6.6 GeV | ||
1.3 Days at 2.2 GeV | 1.3 Days at 2.2 GeV | ||
− | List Range of Beam Currents: (e.g. 10-60 mA) | + | |
+ | |||
+ | '''List Range of Beam Currents: (e.g. 10-60 mA)''' | ||
80-90 nA | 80-90 nA | ||
− | Indicate Major Apparatus: (e.g. CLAS12 & RICH, GLUEX, SHMS, HMS, SBS, SOLID) | + | |
+ | |||
+ | '''Indicate Major Apparatus: (e.g. CLAS12 & RICH, GLUEX, SHMS, HMS, SBS, SOLID)''' | ||
HMS, SHMS, DNP Target | HMS, SHMS, DNP Target | ||
− | Contact Us | + | |
+ | |||
+ | '''Contact Us | ||
Spokespersons | Spokespersons | ||
+ | ''' | ||
+ | Spokeperson * Karl Slifer | ||
+ | |||
+ | Spokeperson * Patricia Solvignon | ||
+ | |||
+ | Spokeperson * Donal Day | ||
− | + | Spokeperson * Dustin Keller | |
− | + | ||
− | + | Spokeperson * Douglas Higinbotham | |
− | + | ||
− | Spokeperson * | + | '''Name *''' |
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | Dustin Keller | ||
− | |||
− | Spokeperson * | ||
− | Douglas Higinbotham | ||
− | |||
− | Name * | ||
Elena Long | Elena Long | ||
− | Institution | + | |
+ | '''Institution''' | ||
University of New Hampshire | University of New Hampshire | ||
− | Address | + | |
+ | '''Address''' | ||
9 Library Way, DeMerritt Room 322 | 9 Library Way, DeMerritt Room 322 | ||
+ | |||
City, State, ZIP/County | City, State, ZIP/County | ||
Durham | Durham | ||
− | Phone | + | |
+ | '''Phone | ||
+ | ''' | ||
6038625312 | 6038625312 | ||
+ | |||
Fax | Fax | ||
N/A | N/A | ||
− | Email Address * | + | |
+ | '''Email Address *''' | ||
ellie@jlab.org | ellie@jlab.org | ||
− | After saving, this email address will automatically receive an email that will provide information on how to update this proposal if needed before the deadline. | + | |
+ | '''After saving, this email address will automatically receive an email that will provide information on how to update this proposal if needed before the deadline. | ||
+ | |||
Author List | Author List | ||
− | As of PAC 43, the author list section was added and should include the full first name, last name, institution, and author type of each author. Please select the CSV file that contains the authors list. Any author with the same first name, last name, and institution will be ignored. | + | As of PAC 43, the author list section was added and should include the full first name, last name, institution, and author type of each author. Please select the CSV file that contains the authors list. Any author with the same first name, last name, and institution will be ignored. ''' |
− | |||
− | |||
− | + | '''Lab Resources List''' | |
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | + | '''List below significant resources - both in equipment and human - that you are requesting from Jefferson Lab in support of mounting and executing the proposed experiment. Do not include items that will be routinely supplied to all running experiments such as the base equipment for the hall and technical support for routine operation, installation, and maintenance. | |
− | + | ''' | |
− | + | '''Major Installations''' | |
− | + | '''Equipment''' | |
− | |||
− | Equipment | ||
JLab/UVA DNP Target | JLab/UVA DNP Target | ||
− | |||
− | |||
− | |||
− | Support Structures | + | '''Support Structures''' |
− | + | Luminosity Monitor, temperature regulation and monitoring for BCMs, Faraday cup | |
− | |||
− | |||
− | |||
− | |||
− | |||
− | + | '''Data Aquisition/Reduction''' | |
− | |||
− | |||
− | |||
− | |||
− | + | '''Support Structures''' | |
− | |||
N/A | N/A | ||
− | |||
− | + | '''Software''' | |
− | |||
N/A | N/A | ||
− | |||
− | + | '''Major Equipment''' | |
− | |||
− | + | '''Magnets''' | |
− | + | DNP Superconducting Magnet | |
− | |||
− | + | '''Power Supplies''' | |
− | |||
− | |||
− | |||
− | |||
− | + | ~100A Magnet Power Supply for target | |
− | + | '''Targets''' | |
− | + | JLab/UVA DNP Target | |
− | Target | ||
− | |||
− | |||
− | + | '''Detectors | |
− | + | ''' | |
− | |||
− | + | N/A | |
− | |||
− | |||
− | |||
− | |||
− | + | '''Electronics''' | |
− | + | N/A | |
− | + | '''Computer Hardware | |
− | + | ''' | |
− | |||
− | |||
− | + | N/A | |
− | |||
− | |||
− | + | '''Other Resources | |
− | + | ''' | |
− | |||
− | |||
− | |||
− | + | Slow raster | |
− | + | '''Beam Requirement List | |
+ | '''''' | ||
− | + | Hall Liaison:''' | |
− | |||
− | |||
− | |||
− | + | N/A | |
− | |||
− | |||
− | + | '''List all combinations of anticipated targets and beam considerations required to execute the experiment. (This list will form the primary basis for the Radiation Safety Assessment Document (RSAD) calculations that must be performed for each experiment.) support for routine operation, installation, and maintenance. | |
− | |||
− | |||
− | |||
− | |||
− | + | Beam Requirements: | |
− | + | Add Beam Requirement | |
− | + | Beam Energy(MeV) Mean Beam Current(µA) Polarization and Other Requirements Est Beam-On Time(hours) Target Materials & Thickness | |
− | + | ''' | |
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | 3021 | + | 2200 0.08 Unpolarized 25 ND3 3021 |
− | |||
− | |||
− | |||
− | |||
− | 0.08 | + | 2200 0.08 Unpolarized 6 Carbon 3000 |
− | Unpolarized | + | 8800 0.08 Unpolarized 776 ND3 3000 |
− | 6 | + | 8800 0.08 Unpolarized 6 Carbon 3000 |
− | |||
− | |||
− | |||
− | + | 6600 0.08 Unpolarized 244 ND3 3021 | |
− | |||
− | |||
− | 3000 | + | 6600 0.08 Unpolarized 6 Carbon 3000 |
− | + | ''' | |
Hazard Identification Checklist | Hazard Identification Checklist | ||
Check all items for which there is an anticipated need. | Check all items for which there is an anticipated need. | ||
+ | ''' | ||
− | Cryogenics Electrical Equipment Radioactive Materials Pressure Vessels Special Target Materials Flammable Drift Container Other Target Materials Vacuum Vessels Radioactive Sources Large Mech. Structures Lasers Hazardous Materials General | + | '''Cryogenics Electrical Equipment Radioactive Materials Pressure Vessels Special Target Materials Flammable Drift Container Other Target Materials Vacuum Vessels Radioactive Sources Large Mech. Structures Lasers Hazardous Materials General |
Beamline Magnets | Beamline Magnets | ||
Analysis Magnets | Analysis Magnets | ||
Line 281: | Line 204: | ||
Capacity | Capacity | ||
101 | 101 | ||
− | Computing Requirement List | + | ''' |
+ | |||
+ | '''Computing Requirement List | ||
Silo/Mass Storage (Tape) | Silo/Mass Storage (Tape) | ||
+ | ''' | ||
10 TB | 10 TB | ||
− | Amount of Simulated Data Expected | + | |
+ | '''Amount of Simulated Data Expected | ||
+ | ''' | ||
50GB | 50GB | ||
− | Amount of Raw Data Expected(TB) | + | |
+ | '''Amount of Raw Data Expected(TB) | ||
+ | ''' | ||
10 | 10 | ||
− | Amount of Processed Data Expected(TB) | + | |
+ | '''Amount of Processed Data Expected(TB)''' | ||
50 | 50 | ||
− | Online Storage Disk Required (TB) | + | |
+ | '''Online Storage Disk Required (TB)''' | ||
10 | 10 | ||
− | Imported Data Expected from Offsite Institution | + | |
+ | '''Imported Data Expected from Offsite Institution''' | ||
N/A | N/A | ||
− | Exported Data Expected to Offsite Locations | + | |
+ | '''Exported Data Expected to Offsite Locations''' | ||
50GB | 50GB | ||
− | |||
− | Simulation Requirements(SPEC CINT 2000hrs) | + | '''Computing''' |
+ | |||
+ | '''Simulation Requirements(SPEC CINT 2000hrs)''' | ||
2000 hrs | 2000 hrs | ||
− | Production(Replay, Analysis, Cooking) Requirements (SPEC CINT 2000hrs) | + | |
+ | '''Production(Replay, Analysis, Cooking) Requirements (SPEC CINT 2000hrs)''' | ||
20,000 hrs | 20,000 hrs | ||
− | Other Requirements | + | |
− | Please add any additional information that will be useful for JLab's IT Division regarding unique configurations or that may require additional resources and/or coordination. Please indicate if possible what fraction of these resources will be provided by collaborating institutions and how much is expected to be provided by JLab. | + | '''Other Requirements |
+ | |||
+ | Please add any additional information that will be useful for JLab's IT Division regarding unique configurations or that may require additional resources and/or coordination. Please indicate if possible what fraction of these resources will be provided by collaborating institutions and how much is expected to be provided by JLab.''' | ||
N/A | N/A | ||
− | Assumed Resource Requirements | + | |
− | Use this section to provide any information regarding the assumed requirements for the resources needed. | + | '''Assumed Resource Requirements |
+ | |||
+ | Use this section to provide any information regarding the assumed requirements for the resources needed.''' | ||
N/A | N/A |
Latest revision as of 13:57, 2 June 2016
Title
Measurements of the Quasi-Elastic and Elastic Deuteron Tensor Asymmetries
Days Requested for Approval
34 Physics + 11 Overhead
Experiment Halls *
C
Proposal Physics Goals
Indicate any Experiments that have physics goals similar to those in your proposal. Approved, Conditionally Approved, and/or Deferred Experiment(s) or proposals.
PR97-102 LOI12-14-002 PR12-15-005
Collaboration-Approved Proposals:
If you will be running in parallel with an approved experiment, please indicate the experiment number
N/A
Key Experiment Parameters
List Beam Energies and Beam Days: (e.g. 30 Days at 11 GeV, 20 Days at 8 GeV)
32.6 Days at 8.8 GeV 10.4 Days at 6.6 GeV 1.3 Days at 2.2 GeV
List Range of Beam Currents: (e.g. 10-60 mA)
80-90 nA
Indicate Major Apparatus: (e.g. CLAS12 & RICH, GLUEX, SHMS, HMS, SBS, SOLID)
HMS, SHMS, DNP Target
Contact Us
Spokespersons Spokeperson * Karl Slifer
Spokeperson * Patricia Solvignon
Spokeperson * Donal Day
Spokeperson * Dustin Keller
Spokeperson * Douglas Higinbotham
Name *
Elena Long
Institution
University of New Hampshire
Address
9 Library Way, DeMerritt Room 322
City, State, ZIP/County
Durham
Phone
6038625312
Fax
N/A
Email Address *
ellie@jlab.org
After saving, this email address will automatically receive an email that will provide information on how to update this proposal if needed before the deadline.
Author List
As of PAC 43, the author list section was added and should include the full first name, last name, institution, and author type of each author. Please select the CSV file that contains the authors list. Any author with the same first name, last name, and institution will be ignored.
Lab Resources List
List below significant resources - both in equipment and human - that you are requesting from Jefferson Lab in support of mounting and executing the proposed experiment. Do not include items that will be routinely supplied to all running experiments such as the base equipment for the hall and technical support for routine operation, installation, and maintenance.
Major Installations
Equipment
JLab/UVA DNP Target
Support Structures
Luminosity Monitor, temperature regulation and monitoring for BCMs, Faraday cup
Data Aquisition/Reduction
Support Structures
N/A
Software
N/A
Major Equipment
Magnets
DNP Superconducting Magnet
Power Supplies
~100A Magnet Power Supply for target
Targets
JLab/UVA DNP Target
Detectors
N/A
Electronics
N/A
Computer Hardware
N/A
Other Resources
Slow raster
Beam Requirement List '
Hall Liaison:
N/A
List all combinations of anticipated targets and beam considerations required to execute the experiment. (This list will form the primary basis for the Radiation Safety Assessment Document (RSAD) calculations that must be performed for each experiment.) support for routine operation, installation, and maintenance.
Beam Requirements: Add Beam Requirement Beam Energy(MeV) Mean Beam Current(µA) Polarization and Other Requirements Est Beam-On Time(hours) Target Materials & Thickness
2200 0.08 Unpolarized 25 ND3 3021
2200 0.08 Unpolarized 6 Carbon 3000
8800 0.08 Unpolarized 776 ND3 3000
8800 0.08 Unpolarized 6 Carbon 3000
6600 0.08 Unpolarized 244 ND3 3021
6600 0.08 Unpolarized 6 Carbon 3000
Hazard Identification Checklist
Check all items for which there is an anticipated need.
Cryogenics Electrical Equipment Radioactive Materials Pressure Vessels Special Target Materials Flammable Drift Container Other Target Materials Vacuum Vessels Radioactive Sources Large Mech. Structures Lasers Hazardous Materials General
Beamline Magnets Analysis Magnets Target Magnets
Type Superconducting Flow Rate 5 l/hr Capacity 101
Computing Requirement List
Silo/Mass Storage (Tape)
10 TB
Amount of Simulated Data Expected
50GB
Amount of Raw Data Expected(TB)
10
Amount of Processed Data Expected(TB)
50
Online Storage Disk Required (TB)
10
Imported Data Expected from Offsite Institution
N/A
Exported Data Expected to Offsite Locations
50GB
Computing
Simulation Requirements(SPEC CINT 2000hrs)
2000 hrs
Production(Replay, Analysis, Cooking) Requirements (SPEC CINT 2000hrs)
20,000 hrs
Other Requirements
Please add any additional information that will be useful for JLab's IT Division regarding unique configurations or that may require additional resources and/or coordination. Please indicate if possible what fraction of these resources will be provided by collaborating institutions and how much is expected to be provided by JLab.
N/A
Assumed Resource Requirements
Use this section to provide any information regarding the assumed requirements for the resources needed.
N/A