Difference between revisions of "Hodoscopes"
From HallCWiki
Jump to navigationJump to search (New page: This wiki serves as a reference page outlining useful details regarding the pre-12 GeV HMS drift chambers. The second drift chamber, DC2, was refurbished in the Summer of 2016 and install...) |
|||
Line 6: | Line 6: | ||
== Technical Documents == | == Technical Documents == | ||
+ | |||
+ | * [https://hallcweb.jlab.org/document/howtos/shms_scintillator_hodoscope.pdf SHMS Hodoscope How-To] - Operations Manual | ||
== Log Book Entries == | == Log Book Entries == | ||
== Masters/PhD Theses == | == Masters/PhD Theses == |
Latest revision as of 10:20, 24 January 2017
This wiki serves as a reference page outlining useful details regarding the pre-12 GeV HMS drift chambers. The second drift chamber, DC2, was refurbished in the Summer of 2016 and installed in Fall 2016.
Useful Links
Publications
Technical Documents
- SHMS Hodoscope How-To - Operations Manual