Difference between revisions of "RC Meeting, Monday, August 20"

From HallCWiki
Jump to navigationJump to search
(Created page with "* '''General''' ** No hall lockup tonight ** Beam is possible, Tuesday night, but not likely. Will not cancel shifts until certain though ** Issues with the upstream beamline...")
 
 
(2 intermediate revisions by the same user not shown)
Line 2: Line 2:
  
 
** No hall lockup tonight
 
** No hall lockup tonight
** Beam is possible, Tuesday night, but not likely. Will not cancel shifts until certain though
+
** Beam is possible Tuesday night, but not likely. Will not cancel shifts until certain though.
** Issues with the upstream beamline vacuum. Ion chambers not yet on
+
** Issues with the upstream beamline vacuum. Ion pumps not yet on
 
** Still work to be done in hall before ready for lockup
 
** Still work to be done in hall before ready for lockup
** Need to look into merging the KAON
+
** Need to look into merging the KAON-LT shift instruction with existing instructions on the wiki
 
+
** New procedure for "on call" - will need to update list on wiki to reflect new on-call list
  
 
* '''Target'''
 
* '''Target'''
Line 14: Line 14:
 
* '''SHMS'''
 
* '''SHMS'''
 
** HGC at 1 atm of C4F8O
 
** HGC at 1 atm of C4F8O
 +
** No bubbles at exit of DC1, but gas seems to be flowing
  
 
* '''HMS'''
 
* '''HMS'''
Line 20: Line 21:
  
 
* '''DAQ'''
 
* '''DAQ'''
 +
** Hall B will be running in "delayed helicity reporting" - likely not an issue (for now)

Latest revision as of 08:02, 21 August 2018

  • General
    • No hall lockup tonight
    • Beam is possible Tuesday night, but not likely. Will not cancel shifts until certain though.
    • Issues with the upstream beamline vacuum. Ion pumps not yet on
    • Still work to be done in hall before ready for lockup
    • Need to look into merging the KAON-LT shift instruction with existing instructions on the wiki
    • New procedure for "on call" - will need to update list on wiki to reflect new on-call list
  • Target
    • Scattering chamber leak repaired over the weekend (big thanks to Dave Meekins, Chris Keith, and Walter Kellner for coming in)
    • Target cooldown underway
  • SHMS
    • HGC at 1 atm of C4F8O
    • No bubbles at exit of DC1, but gas seems to be flowing
  • HMS
    • Cerenkov window repaired and installed
    • Cerenkov at 0.45 atm, C4F8O
  • DAQ
    • Hall B will be running in "delayed helicity reporting" - likely not an issue (for now)