Difference between revisions of "Management/software"
From HallCWiki
Jump to navigationJump to searchLine 1: | Line 1: | ||
[[category:12GeV Software]] | [[category:12GeV Software]] | ||
== 12 GeV software review == | == 12 GeV software review == | ||
− | *Email from Rolf | + | *Dry runs |
+ | ** Email from Rolf | ||
First dry runs for the software review talks are scheduled | First dry runs for the software review talks are scheduled | ||
for Monday May 14th from 1 pm to 5 pm in F326/7. As float we have | for Monday May 14th from 1 pm to 5 pm in F326/7. As float we have | ||
Line 9: | Line 10: | ||
omissions, make improvements. There do not have to be stand-uop | omissions, make improvements. There do not have to be stand-uop | ||
presentations, mainly flipping through the various slides. | presentations, mainly flipping through the various slides. | ||
+ | ** Call in and EVO infomation | ||
+ | Title: JLab Software Review Preparations | ||
+ | Password: 135711 | ||
+ | Phone Bridge | ||
+ | ID: 526 2531 | ||
+ | Password: 4565 | ||
+ | USA Phone num.: +1 626 395 2112 | ||
+ | Call in by ESNet at +1 866-740-1260 (passcode number is 8542553) | ||
*[https://halldweb1.jlab.org/wiki/images/4/43/20120426_JLab_review_Charge_v3.pdf Charge] of the committee. | *[https://halldweb1.jlab.org/wiki/images/4/43/20120426_JLab_review_Charge_v3.pdf Charge] of the committee. | ||
*[https://halldweb1.jlab.org/wiki/images/4/4f/20120410_12GeV_Software_Review.pdf Agenda] of meeting on June 7 and 8th. | *[https://halldweb1.jlab.org/wiki/images/4/4f/20120410_12GeV_Software_Review.pdf Agenda] of meeting on June 7 and 8th. |
Revision as of 09:08, 11 May 2012
12 GeV software review
- Dry runs
- Email from Rolf
First dry runs for the software review talks are scheduled for Monday May 14th from 1 pm to 5 pm in F326/7. As float we have the next day, Tuesday from 3:30 pm on, at the same location. The main idea of these dry runs is to have presentations near-complete such that we can bounce ideas off each other, find omissions, make improvements. There do not have to be stand-uop presentations, mainly flipping through the various slides.
- Call in and EVO infomation
Title: JLab Software Review Preparations Password: 135711 Phone Bridge
ID: 526 2531 Password: 4565 USA Phone num.: +1 626 395 2112
Call in by ESNet at +1 866-740-1260 (passcode number is 8542553)
- Charge of the committee.
- Agenda of meeting on June 7 and 8th.
- Current working drafts of morning and afternoon talks and backup material for June 2012 software review.
- [Morning Session] (May 3, 2012: Added a copy of the charge for reference.)
- [Afternoon Session] (May 10, 2012) Latest version from GN, includes SIMC material from JRA.
- Updated slides for Mark Jones' section of the morning talk.
- [DAQ Summary] (May 10, 2012) from Brad Sawatzky, a better overview with timeline is coming.
- [SIMC overview - Possible backup material]
- All hall [Documents ] for planning for a JLab softwrae readiness review