Jump to navigationJump to searchLine 3: | Line 3: | ||
| '''Ebeam''' || '''Item''' || '''Status''' || '''Comment''' | | '''Ebeam''' || '''Item''' || '''Status''' || '''Comment''' | ||
|- | |- | ||
− | | 3.8 GeV || Q2=0.5 W=2.40 x=0.09 theta_Shms= | + | | 3.8 GeV || Q2=0.5 W=2.40 x=0.09 theta_Shms=6.79 PART 1 || not done || |
|- | |- | ||
− | | 4.9 GeV || Q2=0.5 W=2.40 x=0.09 theta_Shms= | + | | 3.8 GeV || Q2=0.5 W=2.40 x=0.09 theta_Shms=9.79 || not done || |
+ | |- | ||
+ | | 3.8 GeV || Q2=0.5 W=2.40 x=0.09 theta_Shms=6.79 PART 2 || not done || | ||
+ | |- | ||
+ | | 4.9 GeV || Q2=0.5 W=2.40 x=0.09 theta_Shms=8.86 || not done || | ||
+ | |- | ||
+ | | 4.9 GeV || Q2=0.5 W=2.40 x=0.09 theta_Shms=11.86 || not done || | ||
+ | |- | ||
+ | | 4.9 GeV || Q2=0.5 W=2.40 x=0.09 theta_Shms=6.00 || not done || | ||
|- | |- | ||
|} | |} |
Revision as of 15:41, 27 November 2018
- Table of Kaon LT Physics Status at Ebeam = 3.8/4.9 GeV
Ebeam | Item | Status | Comment |
3.8 GeV | Q2=0.5 W=2.40 x=0.09 theta_Shms=6.79 PART 1 | not done | |
3.8 GeV | Q2=0.5 W=2.40 x=0.09 theta_Shms=9.79 | not done | |
3.8 GeV | Q2=0.5 W=2.40 x=0.09 theta_Shms=6.79 PART 2 | not done | |
4.9 GeV | Q2=0.5 W=2.40 x=0.09 theta_Shms=8.86 | not done | |
4.9 GeV | Q2=0.5 W=2.40 x=0.09 theta_Shms=11.86 | not done | |
4.9 GeV | Q2=0.5 W=2.40 x=0.09 theta_Shms=6.00 | not done |
- Table of Kaon LT Commissioning Status.
Item | Status | Comment |
Detector Checkout | Completed | |
HMS Trigger PID | Completed | |
SHMS Trigger PID | Completed | |
BPM calibration check | Not done | |
Beam energy measurement | Completed [1] | |
High and low current BCM calibration | Completed low current up to 57uA | Calibration plots |
HMS/SHMS optics study | Completed | |
HMS/SHMS single arm elastic | Completed | |
HMS/SHMS coincidence ep elastic | Completed | 25K events ( wanted 50K) |
Golden HMS/SHMS sieve run | Completed | Used to check the stability of beam positions at different energies |
Luminosity scan | Completed |
- Table of Kaon LT Physics Status at Ebeam = 10.6 GeV
Item | Status | Comment |
Q2=3.0 W=2.32 x=0.40 theta_Shms=15.18 | Completed | 65% of stat goal on LH2; Al done Summary plot of all three settings, updated Oct 6 |
Q2=3.0 W=2.32 x=0.40 theta_Shms=18.18 | Completed | 150% of stat goal on LH2; Al done Summary plot of all three settings, updated Oct 6 |
Q2=3.0 W=2.32 x=0.40 theta_Shms=21.18 | Completed | 95% of stat goal on LH2; Al done Summary plot of all three settings, updated Oct 6 |
Q2=2.115 W=2.95 x=0.21 theta_Shms=7.74 | Completed | 41 % of stat goal on LH2; Al done [2]Summary plot of all three settings |
Q2=2.115 W=2.95 x=0.21 theta_Shms=10.74 | Completed | 43 % of stat goal on LH2; Al done [3]Summary plot of all three settings |
Q2=2.115 W=2.95 x=0.21 theta_Shms=13.74 | Completed | 42 % of stat goal on LH2; Al done [4] Summary plot of all three settings |
Q2=4.4 W=2.74 x=0.4 theta_Shms=9.81 | Completed | 66% of stat goal on LH2; Al done Summary plot of SHMS Right |
Q2=4.4 W=2.74 x=0.4 theta_Shms=12.81 | Completed | 63% of the stat goal on LH2; Al done Summary plot of SHMS Center and Left |
Q2=4.4 W=2.74 x=0.4 theta_Shms=15.81 | Completed | 69 % of stat goal on LH2; Al done Summary plot of SHMS Center and Left |
Q2=3. W=3.14 x=0.25 theta_Shms=6.65 | Completed | 64.77% of stat goal on LH2, Al done Summary plot of SHMS Right |
Q2=3. W=3.14 x=0.25 theta_Shms=9.42 | Completed | 61% of stat goal on LH2, Al done Summary plot of SHMS Center |
Q2=3. W=3.14 x=0.25 theta_Shms=12.42 | Completed | 64% of stat goal on LH2, Al done Summary plot of SHMS Left |
Q2=5.5 W=3.02 x=0.4 theta_Shms=6.65 | Completed | 60.09% of stat goal on LH2, Al done Summary plot of SHMS Right |
Q2=5.5 W=3.02 x=0.4 theta_Shms=9.56 | Completed | 61.5% of stat goal on LH2, Al done Summary plot of SHMS Center |
Q2=5.5 W=3.02 x=0.4 theta_Shms=12.56 | Completed | 60.7% of stat goal on LH2, Al done Summary plot of SHMS Left |
- Table of Kaon LT Commissioning Status.
Item | Status | Comment |
Detector Checkout | Completed | |
HMS Trigger PID | Completed | |
SHMS Trigger PID | Completed | |
BPM calibration check | Not done | |
Beam energy measurement | Completed [5] | |
High and low current BCM calibration | Completed low current up to 57uA | Calibration plots |
HMS/SHMS optics study | Completed | |
HMS/SHMS single arm elastic | Completed | |
HMS/SHMS coincidence ep elastic | Completed | 25K events ( wanted 50K) |
Golden HMS/SHMS sieve run | Completed | Used to check the stability of beam positions at different energies |
Luminosity scan | Completed |