Difference between revisions of "Kaon LT Status Page"

From HallCWiki
Jump to navigationJump to search
Line 41: Line 41:
 
|Golden HMS/SHMS sieve run || Not done ||
 
|Golden HMS/SHMS sieve run || Not done ||
 
|-
 
|-
}
+
|}
  
 
* Table of Kaon LT Commissioning Status at 3.8 GeV
 
* Table of Kaon LT Commissioning Status at 3.8 GeV
Line 67: Line 67:
 
|Golden HMS/SHMS sieve run || Not done ||
 
|Golden HMS/SHMS sieve run || Not done ||
 
|-
 
|-
}
+
|}
  
 
*Table of Kaon LT Physics Status at Ebeam = 10.6 GeV
 
*Table of Kaon LT Physics Status at Ebeam = 10.6 GeV

Revision as of 15:45, 27 November 2018

  • Table of Kaon LT Physics Status at Ebeam = 3.8/4.9 GeV
Ebeam Item Status Comment
3.8 GeV Q2=0.5 W=2.40 x=0.09 theta_Shms=6.79 PART 1 not done
3.8 GeV Q2=0.5 W=2.40 x=0.09 theta_Shms=9.79 not done
3.8 GeV Q2=0.5 W=2.40 x=0.09 theta_Shms=6.79 PART 2 not done
4.9 GeV Q2=0.5 W=2.40 x=0.09 theta_Shms=8.86 not done
4.9 GeV Q2=0.5 W=2.40 x=0.09 theta_Shms=11.86 not done
4.9 GeV Q2=0.5 W=2.40 x=0.09 theta_Shms=6.00 not done
  • Table of Kaon LT Commissioning Status at 3.8 GeV
Item Status Comment
Detector Checkout Not done
HMS Trigger PID Not done
SHMS Trigger PID Not done
BPM calibration check Not done
Beam energy measurement Not done
High and low current BCM calibration Not done
HMS/SHMS optics study Not done
HMS/SHMS single arm elastic Not done
HMS/SHMS coincidence ep elastic Not done
Golden HMS/SHMS sieve run Not done
  • Table of Kaon LT Commissioning Status at 3.8 GeV
Item Status Comment
Detector Checkout Not done
HMS Trigger PID Not done
SHMS Trigger PID Not done
BPM calibration check Not done
Beam energy measurement Not done
High and low current BCM calibration Not done
HMS/SHMS optics study Not done
HMS/SHMS single arm elastic Not done
HMS/SHMS coincidence ep elastic Not done
Golden HMS/SHMS sieve run Not done
  • Table of Kaon LT Physics Status at Ebeam = 10.6 GeV
Item Status Comment
Q2=3.0 W=2.32 x=0.40 theta_Shms=15.18 Completed 65% of stat goal on LH2; Al done Summary plot of all three settings, updated Oct 6
Q2=3.0 W=2.32 x=0.40 theta_Shms=18.18 Completed 150% of stat goal on LH2; Al done Summary plot of all three settings, updated Oct 6
Q2=3.0 W=2.32 x=0.40 theta_Shms=21.18 Completed 95% of stat goal on LH2; Al done Summary plot of all three settings, updated Oct 6
Q2=2.115 W=2.95 x=0.21 theta_Shms=7.74 Completed 41 % of stat goal on LH2; Al done [1]Summary plot of all three settings
Q2=2.115 W=2.95 x=0.21 theta_Shms=10.74 Completed 43 % of stat goal on LH2; Al done [2]Summary plot of all three settings
Q2=2.115 W=2.95 x=0.21 theta_Shms=13.74 Completed 42 % of stat goal on LH2; Al done [3] Summary plot of all three settings
Q2=4.4 W=2.74 x=0.4 theta_Shms=9.81 Completed 66% of stat goal on LH2; Al done Summary plot of SHMS Right
Q2=4.4 W=2.74 x=0.4 theta_Shms=12.81 Completed 63% of the stat goal on LH2; Al done Summary plot of SHMS Center and Left
Q2=4.4 W=2.74 x=0.4 theta_Shms=15.81 Completed 69 % of stat goal on LH2; Al done Summary plot of SHMS Center and Left
Q2=3. W=3.14 x=0.25 theta_Shms=6.65 Completed 64.77% of stat goal on LH2, Al done Summary plot of SHMS Right
Q2=3. W=3.14 x=0.25 theta_Shms=9.42 Completed 61% of stat goal on LH2, Al done Summary plot of SHMS Center
Q2=3. W=3.14 x=0.25 theta_Shms=12.42 Completed 64% of stat goal on LH2, Al done Summary plot of SHMS Left
Q2=5.5 W=3.02 x=0.4 theta_Shms=6.65 Completed 60.09% of stat goal on LH2, Al done Summary plot of SHMS Right
Q2=5.5 W=3.02 x=0.4 theta_Shms=9.56 Completed 61.5% of stat goal on LH2, Al done Summary plot of SHMS Center
Q2=5.5 W=3.02 x=0.4 theta_Shms=12.56 Completed 60.7% of stat goal on LH2, Al done Summary plot of SHMS Left
  • Table of Kaon LT Commissioning Status at 10.6 GeV
Item Status Comment
Detector Checkout Completed
HMS Trigger PID Completed
SHMS Trigger PID Completed
BPM calibration check Not done
Beam energy measurement Completed [4]
High and low current BCM calibration Completed low current up to 57uA Calibration plots
HMS/SHMS optics study Completed
HMS/SHMS single arm elastic Completed
HMS/SHMS coincidence ep elastic Completed 25K events ( wanted 50K)
Golden HMS/SHMS sieve run Completed Used to check the stability of beam positions at different energies
Luminosity scan Completed