Difference between revisions of "Testing SHMS Preshower"

From HallCWiki
Jump to navigationJump to search
Line 6: Line 6:
 
* Computer is called ''cnu''. The account is gep5.
 
* Computer is called ''cnu''. The account is gep5.
 
== HV Setup ==
 
== HV Setup ==
* Can control the CAEN 403 through terminal on ''cnu''. T
+
* Can control the CAEN 403 through terminal on ''cnu''.  
 
** Open terminal  
 
** Open terminal  
 
** type "su" to login as superuser.
 
** type "su" to login as superuser.
 
** type "minicom"
 
** type "minicom"
 
* [https://hallcweb.jlab.org/wiki/images/0/0f/Calorimeter_specs.pdf Preshower HV cabling map]
 
* [https://hallcweb.jlab.org/wiki/images/0/0f/Calorimeter_specs.pdf Preshower HV cabling map]

Revision as of 14:43, 28 June 2012

Status

  • The preshower has been cabled with signal and HV.
  • Have checked setting each channel to 1400V that signal is seen.

Computer Setup

  • Computer is called cnu. The account is gep5.

HV Setup

  • Can control the CAEN 403 through terminal on cnu.
    • Open terminal
    • type "su" to login as superuser.
    • type "minicom"
  • Preshower HV cabling map