* The preshower has been cabled with signal and HV. | * The preshower has been cabled with signal and HV. | ||
* Have checked setting each channel to 1400V that signal is seen. | * Have checked setting each channel to 1400V that signal is seen. | ||
− | *06/28 Taking data for number of | + | *06/28 Taking data for number of events through calorimeter and external PMT's |
== Computer Setup == | == Computer Setup == |
Revision as of 14:52, 28 June 2012
Status
- The preshower has been cabled with signal and HV.
- Have checked setting each channel to 1400V that signal is seen.
- 06/28 Taking data for number of events through calorimeter and external PMT's
Computer Setup
- Computer is called cnu. The account is gep5.
HV Setup
- Can control the CAEN 403 through terminal on cnu.
- Open terminal
- type "su" to login as superuser.
- type "minicom"
- Preshower HV cabling map