Difference between revisions of "F2 Large x runplan: February 2019"

From HallCWiki
Jump to: navigation, search
Line 8: Line 8:
 
  ! targets || 10 cm LH2, 10 cm LD2 10 cm Dummy, C, 10B4C, 11B4C
 
  ! targets || 10 cm LH2, 10 cm LD2 10 cm Dummy, C, 10B4C, 11B4C
 
  |-
 
  |-
  | trigger || ELREAL
+
  ! trigger || ELREAL
 
  |-
 
  |-
 
  ! SHMS collimator: || COLLIMATOR  
 
  ! SHMS collimator: || COLLIMATOR  

Revision as of 18:11, 14 February 2019

  • Conditions: SHMS only.
beam current (uA): 50 uA
fast raster: 2x2mm
targets 10 cm LH2, 10 cm LD2 10 cm Dummy, C, 10B4C, 11B4C
trigger ELREAL
SHMS collimator: COLLIMATOR
SHMS trigger: ELREAL for physics data taking
SHMS angle/momentum: 13.11 deg / -8.5 GeV/c

Goal is to obtain ~5000 electrons in the range 1.5<x<1.9 for each production target.

  • Take ~1-2 hours of LH2 data to verify the position of the elastic peak at x=1. If not at x=1, correct count estimates to account for this.
  • Take data on C,10B4C, 11BC at 50 uA. Each target should take about 2.2 hours at 50 uA
  • Take LD2 data for 4 hours at 50 uA.
  • Take dummy data for at least 1 hours at 40 uA.