Line 15: Line 15:
  
 
* Continued running J/Psi on kinematic setting 3 high-t
 
* Continued running J/Psi on kinematic setting 3 high-t
* SHMS HB problems right after last meeting. Called Steve. Jack came to help remote reboot of the PLC. This seemed to fix things.
+
* The target alarm situation where the heater goes to zero was occurring more frequently Friday evening.
* Strange target alarms. Loss of cooling power?
+
* Running at 55 -60 uA. Will ask for more if beam is stable.
+
* Replace camera 3 (temporarily).  Needs better cable placement.
+
* Might turn off camera rotation. Need to follow up with Steve.
+
  
 
= Current Run Plan =
 
= Current Run Plan =

Revision as of 16:08, 23 February 2019

Main | Online | RC | Run Plan | Official Website | Redmine | Index | Nav
Jpsi007.png

RC Meeting Information

No Meeting today

Useful Links

Current Status

  • Continued running J/Psi on kinematic setting 3 high-t
  • The target alarm situation where the heater goes to zero was occurring more frequently Friday evening.

Current Run Plan

Notices in Effect for Shift Crew

  • Shift Leader is responsible for 50k replays. Even if the TO is actually doing them.
  • Use the script do_coin_50k.sh to run the 50k replays. This will run both arm's first 50k replay. Then after ~500k events run a 50k replay for events 550k to 600k.

If you want to manually run each script, you can use a third argument to the standard 50k scripts which is the event number.


Current Issues

  • Need to notify Steve to turn on rotation controller before rotation.