(Current Issues)
(Planned Accesses to the Hall)
 
Line 48: Line 48:
  
 
= Planned Accesses to the Hall =
 
= Planned Accesses to the Hall =
*  In order to rotate the spectrometers we will need access to the hall.  Whether we need controlled or a short escorted access depends on if we want to do anything else while we are down.  This should be decided by the end of this meeting, so we can inform the relevant parties.
+
*  In order to rotate the spectrometers and change central momenta we will need access to the hall.  Whether we need a longer access with survey/sweep or a short escorted access depends on if we want to do anything else while we are down.  Changing the Cherenkov pressure is one task would could do with a longer access (~1 hour).  Steve should be able to rotate and set magnet currents in a short access.  This should be decided by the end of this meeting, so we can inform the relevant parties.
  
 
= Planned Accelerator Configuration Changes =
 
= Planned Accelerator Configuration Changes =

Latest revision as of 16:28, 28 February 2019

Main | Online | RC | Run Plan | Official Website | Redmine | Index | Nav
Jpsi007.png

RC Meeting Information

RC Daily Meetings are at 4:30 PM, 2nd floor Counting House Meeting Room

  • Bluejeans remote connection information:
 To join the Meeting:
 https://bluejeans.com/861439920
 To join via Room System:
 Video Conferencing System: bjn.vc -or-199.48.152.152
 Meeting ID : 861439920
 To join via phone :
 1)  Dial:
   +1.408.740.7256 (US (San Jose))
   +1.888.240.2560 (US Toll Free))
   +1.408.317.9253 (US (Primary, San Jose))
   (see all numbers - http://bluejeans.com/numbers)
 2)  Enter Conference ID : 861439920

Useful Links

Current Status

  • No new major issues over the last 24 hours.

Current Run Plan

  • Continue running kinematics 2 through the night.
  • Switch to kinematics 3 around 9am Friday morning.

Notices in Effect for Shift Crew

  • Shift Leader is responsible for 50k replays. Even if the TO is actually doing them.
  • Missing Reference Times during the replay: check in the 50k. Check in full replay, if able. If it happens, call RC. Guidance to solve it is here: https://logbooks.jlab.org/entry/3654584

Current Issues

  • No new issues since yesterday.

Recently resolved Issues:

Unresolved Issues:

Planned Accesses to the Hall

  • In order to rotate the spectrometers and change central momenta we will need access to the hall. Whether we need a longer access with survey/sweep or a short escorted access depends on if we want to do anything else while we are down. Changing the Cherenkov pressure is one task would could do with a longer access (~1 hour). Steve should be able to rotate and set magnet currents in a short access. This should be decided by the end of this meeting, so we can inform the relevant parties.

Planned Accelerator Configuration Changes

Special Requests