Difference between revisions of "RC Meeting and Run Plan, Monday, March 4th"

From HallCWiki
Jump to: navigation, search
(Created page with "{{Template:J/psi-007 Experiment Navigation With Logo}} = RC Meeting Information = <b> RC Daily Meetings are at 4:30 PM, 2nd floor Counting House Meeting Room </b> * Bluejea...")
 
(Current Status)
Line 27: Line 27:
  
 
= Current Status =
 
= Current Status =
Smooth running over the night
+
Accelerator issues had about 22 hours downtime on Friday-Saturday.  Recovered some of that time with truncated beam-studies today.
Had an SHMS dipole trip (interlocks and slow discharge), but recovered relatively quickly: https://logbooks.jlab.org/entry/3661785
+
We will finish up officially at 8am tomorrow.
  
 
= Current Run Plan =
 
= Current Run Plan =

Revision as of 15:11, 4 March 2019

Main | Online | RC | Run Plan | Official Website | Redmine | Index | Nav
Jpsi007.png

RC Meeting Information

RC Daily Meetings are at 4:30 PM, 2nd floor Counting House Meeting Room

  • Bluejeans remote connection information:
 To join the Meeting:
 https://bluejeans.com/861439920
 To join via Room System:
 Video Conferencing System: bjn.vc -or-199.48.152.152
 Meeting ID : 861439920
 To join via phone :
 1)  Dial:
   +1.408.740.7256 (US (San Jose))
   +1.888.240.2560 (US Toll Free))
   +1.408.317.9253 (US (Primary, San Jose))
   (see all numbers - http://bluejeans.com/numbers)
 2)  Enter Conference ID : 861439920

Useful Links

Current Status

  • Accelerator issues had about 22 hours downtime on Friday-Saturday. Recovered some of that time with truncated beam-studies today.
  • We will finish up officially at 8am tomorrow.

Current Run Plan

  • Finished up kinematics 2, and started kinematics 4.
  • Will stay at setting 4 for the duration of the experiment.

Notices in Effect for Shift Crew

  • Shift Leader is responsible for 50k replays. Even if the TO is actually doing them.
  • Missing Reference Times during the replay: check in the 50k. Check in full replay, if able. If it happens, call RC. Guidance to solve it is here: https://logbooks.jlab.org/entry/3654584

Current Issues

Recently resolved Issues:

  • Rotation controller was rebooted and Q3 current read-back reset during Steve Lassiter's access this morning. Rotation controllers are remotely disabled, and Steve should be contacted to re-enable them if we need to rotate (shouldn't need to).

Unresolved Issues:

Planned Accesses to the Hall

  • None

Planned Accelerator Configuration Changes

Special Requests