Difference between revisions of "Agendas for 12GeV software meetings"
From HallCWiki
Jump to navigationJump to searchLine 14: | Line 14: | ||
== Aug 7, 2012 == | == Aug 7, 2012 == | ||
− | + | [https://mailman.jlab.org/pipermail/hallcsw/2012-August/000038.html Summary] of meeting. | |
== July 10, 2012 == | == July 10, 2012 == |
Revision as of 09:32, 15 August 2012
Call in using phone number 866-740-1260 with code 1150811.
Login into www.readytalk.com to view presentations.
Meet biweekly every Tues at 1pm in B101.
Next meeting Tues August 14th, 2012 at 1 pm in B101
Aug 14, 2012
Aug 7, 2012
Summary of meeting.
July 10, 2012
Discussed software issues. When looking in detail , a discrepancy between the ENGINE and the new C++ code for number of raw scintillator and calorimeter.
June 26, 2012
Presentation by Simon Zhamkochyan on his work on the shower detector in the C++ analyzer.
June 12, 2012
Short set of slides to introduce GIT , a version control software.
May 29, 2012
Summary of meeting
May 15, 2012
HMS calorimeter software documentation
May 1, 2012
- Summary of meeting
April 17, 2012
- File:Hms calo coding.pdf Vardan Tadevosyan's overview of HMS calorimeter software documentation.
April 3, 2012
- Slides on the Analysis workflow by John Arrington for the 12 GeV software review.
- Draft of a Research Management Plan for the Hall C 12 GeV Detector Software.
- Summary of meeting
March 20, 2012
- First draft of milestones for the JLab Software Review. Send comments and corrections to Mark Jones (jones@jlab.org).
- File:Software Decoding.pdf. Discussion of building hit lists in Root analyzer by Steve Wood.
- Presentation by Gabi Niculescu. Slides 3-5 are outline for talk at the JLab Software Review. Beginning with slide 7 is a discussion of strategy for developing the Hall C C++ analyzer with some specific examples.
- Summary of meeting