Difference between revisions of "RC Update and Run plan for Aug 27, 2020"

From HallCWiki
Jump to: navigation, search
(General updates)
Line 43: Line 43:
 
* Simona SoLID cherenkov work
 
* Simona SoLID cherenkov work
  
=When there is an opportunistic access=
 
* Fill reference cell with Helium
 
* Check air flow in laser optics box
 
* Work on air compressor: if the access is during the day shift, we can check with the techs to see if they can work on the air compressor that Walter rented. It needs to be connected.
 
* Reset the SHMS rotation control driver
 
* Diagnose/resolve the transport ion chamber issue. (Investigation is ongoing by Jerry Kowal)
 
  
== Recent polarization measurements ==
+
*<b>General Reminders for Running</b>
@ 180 deg
+
* Swing (08/25) 16:42 NMR - 39.5%
+
* Swing (08/25) 23:50 NMR - 45.2%
+
* Owl (08/26)  5:02 NMR - 45%
+
* Day (08/26) 10:05 NMR - 45.8%, pNMR - 45.3%
+
* Day (08/26) 15:33 NMR - 44.1%, pNMR - 46.2%
+
* Two more pNMR measurements required
+
 
+
= Current Run Plan =
+
 
+
<b> Normal Production running </b>
+
 
+
*<b>Prerequisites</b>
+
  
 
<ul>   
 
<ul>   
* [https://logbooks.jlab.org/entry/3833511 New position for Briana and Will]  
+
* [https://logbooks.jlab.org/entry/3835151 New position for Briana and Will]  
  
 
* Make sure the raster size is correct (4--4.5mm)
 
* Make sure the raster size is correct (4--4.5mm)
Line 81: Line 62:
  
 
</ul>
 
</ul>
 
* <b>Run plan</b>
 
<b>Production Run Plan on longitudinal (180 position) applies to Aug 26 day shift </b>
 
* 1 hour run
 
* Flip IHWP every ~8 hours (beam)
 
** Submit changing request to Hall A and ensure they comply with the request within the hour. If difficulty, call RC immediately.
 
* NMR + pNMR measurement every 5 hours (beam or no beam)
 
** Measure pNMR 20s before NMR. pNMR instruction: https://hallcweb.jlab.org/wiki/images/5/56/PNMR_Training_Slides_20_08_25.pdf
 
  
  

Revision as of 20:54, 27 August 2020

Back to the precious page

RC Meeting Information

RC Daily Meetings are at 4:15 PM, remote

General updates

Pending problem(s) / Things to track

Current Run Plan

  • Keep taking production data with PolHe3 transverse (HMS is at 20 degrees -4 GeV and SHMS is at 18 degrees -5.6 GeV (Kin C-Z))

List of Tasks for the Next Down Time

  • Simona SoLID cherenkov work


  • General Reminders for Running
    • Make sure the raster size is correct (4--4.5mm)
    • Monitor beam parameters/configuration very often and post an entry like this at the beginning of your shift and when run conditions have changed
    • Running on cell targets: raster always ON (4--4.5mm, size will be determined by the scraping checks), orbit locks ON, current ramp rate 1 muA/sec
    • Always take 120Hz of EDTM
    • Fill the BTA with realistic numbers. If the desired beam current is not delivered prorate your ABUs!
    • Change the IHWP at least every 8 hours when running on glass cells. Call Hall A in advance to request. If there are any issues, call the RC


Notices in Effect for Shift Crew

  • Follow all COVID rules and regulations as well as remind each other. Additional food guild lines:
    • All food are removed from the round table. Fruit are now store in the fridge, and individually packaged snacks are store on the shelf below the coffee machine.
    • No food near the SL and TO control station. If you would like to eat something, please use the empty round table (used to store food in the past), that is now empty and sanitized.
    • New coffee guide line: it is much preferred if you can bring you mug for the coffee. During the shift if one need to drink coffee near the control station, then the coffee mug must have a lid or have some kind of cover.
  • Beam positions: [1]
  • Policy for CANS-related hall status change: Make a logbook entry when the hall goes in, or comes out of laser-controlled access.
  • Inform the RC of any access that the Target Team requires. The RC will coordinate with RadCon to make everything run smoothly.
  • Please make sure that the orbit locks are enabled and the beam does not drift from its nominal position.
  • Ramp rate lock instructions are here and added to checklist[2]
  • An new reference Cell refill procedure: New procedure
  • Magnet policies
    • Spectrometer GUI (go_magnets) should always be visible on Shift Leader computer, hcdesk3
    • Slow ramping procedure of the SHMS, go small steps to the MOL, an great example (1 hour 30 min process)
    • HMS Q1 must be ramped down in 50A steps in all cases
    • Do not ramp HMS Q2 to zero, only go to 10A and then switch off power.
    • New updates to the magnet momentum ramping procedure: https://hallcweb.jlab.org/wiki/index.php/How_to_operate_and_monitor_the_Spectrometer_Magnets
    • If any of the Spectrometers magnets trip, take a screenshot of the PSU window and check the hall for smoke or water with the camera before resetting the interlock and post it to hclog
  • When rotating the spectrometer, use HCCAM01 to keep an eye on the SOLID Cherenkov test stand when rotating SHMS (in addition to watching the live angle-cam image, etc). The updated rotation instruction can be found: https://hallcweb.jlab.org/wiki/index.php/Spectrometer_Rotation#NOTICES_IN_EFFECT
  • New SHMS matrix element


Planned Accelerator Configuration Changes

  • Hall C to 1st pass on 8/31 and back to 5th pass on 9/03


  • Bluejeans remote connection information:
 To join the Meeting:
 https://bluejeans.com/861439920
 To join via Room System:
 Video Conferencing System: bjn.vc -or-199.48.152.152
 Meeting ID : 861439920
 To join via phone :
 1)  Dial:
   +1.408.740.7256 (US (San Jose))
   +1.888.240.2560 (US Toll Free))
   +1.408.317.9253 (US (Primary, San Jose))
   (see all numbers - http://bluejeans.com/numbers)
 2)  Enter Conference ID : 861439920