= Current Issues =
 
= Current Issues =
 
# Replace flow switches for (HMS?) magnet power supplies: next opportunistic access (Joe Beaufait) (<span style="color:red"> '''PENDING''' </span>)
 
# Replace flow switches for (HMS?) magnet power supplies: next opportunistic access (Joe Beaufait) (<span style="color:red"> '''PENDING''' </span>)
# Q3 insulating vacuum spikes generating alarms. For example, https://logbooks.jlab.org/entry/3930175 .  
+
# Q3 insulating vacuum spikes generating annoyance alarms that take minutes to recover. https://logbooks.jlab.org/entry/3930175 Also, see burp at https://logbooks.jlab.org/entry/3932992 .
 
# One HB LHe incident of note: https://logbooks.jlab.org/entry/3929152 . (possible clue to the origin?)
 
# One HB LHe incident of note: https://logbooks.jlab.org/entry/3929152 . (possible clue to the origin?)
 
# Target ladder camera was identified to be bad: Joe Beaufait will order camera (<span style="color:red"> '''PENDING''' </span>)
 
# Target ladder camera was identified to be bad: Joe Beaufait will order camera (<span style="color:red"> '''PENDING''' </span>)

Revision as of 08:46, 27 October 2021


RC Meeting Information

RC Daily Meetings are at 10 am, remote connection link: https://bluejeans.com/861439920

Accelerator Status

  1. Beam delivery back to Halls B,C,D on owl shift.

Hall C Status

  1. Back in production at 42 muA on late swing. (Some beam early on swing, but mostly tuning for Hall B.)
  2. On late swing, alarms due to dropping HB LHe levels. We have our good days, but they always come back. Steve L intervened. https://logbooks.jlab.org/entry/3933018 https://logbooks.jlab.org/entry/3933051
  3. End of swing, SHMS Q2 Interlock plus some sort of communication reset required on a screen I haven't seen before. https://logbooks.jlab.org/entry/3933073 Also Steve L.
  4. Number of good pions is ????.

Current Run Plan

  1. Day shift only: Try to take 1 hour of Dummy target each day. (a 100% live hour)
  2. Tentatively scheduled: a BCM calibration on Wednesday mid-afternoon.
  3. Continue data taking until early Nov

Current Issues

  1. Replace flow switches for (HMS?) magnet power supplies: next opportunistic access (Joe Beaufait) ( PENDING )
  2. Q3 insulating vacuum spikes generating annoyance alarms that take minutes to recover. https://logbooks.jlab.org/entry/3930175 Also, see burp at https://logbooks.jlab.org/entry/3932992 .
  3. One HB LHe incident of note: https://logbooks.jlab.org/entry/3929152 . (possible clue to the origin?)
  4. Target ladder camera was identified to be bad: Joe Beaufait will order camera ( PENDING )
  5. Still running with no UPS on the SHMS cryo controls - Steve L. has ordered batteries and UPS. ( PENDING )
  6. HCCAM02 not functioning (lift required to replace).