Difference between revisions of "June 17, 2022"
From HallCWiki
Jump to navigationJump to searchLine 48: | Line 48: | ||
*** [https://logbooks.jlab.org/entry/4003720 HMS Dipole waterflow interlock explanation] | *** [https://logbooks.jlab.org/entry/4003720 HMS Dipole waterflow interlock explanation] | ||
*** Currently S. Lassiter is back in counting house and ramping up magnets | *** Currently S. Lassiter is back in counting house and ramping up magnets | ||
+ | (S. Lassiter needs to put crush washers in LCW filters, so we may see a little bit of water | ||
+ | by the HMS boogie for now, until he can put the washers next week.) | ||
= Current Run Plan = | = Current Run Plan = |
Revision as of 09:42, 17 June 2022
RC Meeting Information
RC Daily Meetings are at 11:00 (am) via Zoom and in person in the counting house meeting room (2nd floor)
- Zoom remote connection information:
Join ZoomGov Meeting https://jlab-org.zoomgov.com/j/1607100885?pwd=ZFBsRTFsYm5Zb0laZ0tyZXNjcEE0QT09 Meeting ID: 160 710 0885 Passcode: 595071 One tap mobile +16692545252,,1607100885# US (San Jose) +16468287666,,1607100885# US (New York) Dial by your location +1 669 254 5252 US (San Jose) +1 646 828 7666 US (New York) +1 669 216 1590 US (San Jose) +1 551 285 1373 US 833 568 8864 US Toll-free Meeting ID: 160 710 0885 Find your local number: https://jlab-org.zoomgov.com/u/ab2CekLXgQ
Useful Links
- Shift Signup (Read only)
- PionLT_2022_Physics_Status
- KaonLT Logbook - Used for PionLT updates too
- Physics analysis updates should be cross posted here
- Run Plans
- Hall-C Controls
- Hall-C Logbook
- MCC White Board
Current Status
- Jun 16 - Swing (yesterday)
- Received up to 25 uA of beam and did Carbon Hole check Carbon Hole (Raster ON), Carbon Hole (Raster OFF)
- started HMS optics studies
- Jun 17 - Owl (today)
- limited to 15 uA beam due to accelerator issues (Ops will work on Hall C line today to try and give us higher currents)
- completed the detector checkout part of run plan
- while doing +/-8 cm C12 optics run plan, HMS Dipole interlocked (~ 4:30 am )
- SHMS optics was taken instead in the meantime
- towards the end of Owl, HMS Q2, Q2 Dipole had all went to interlock
- Jun 17 - Day (today)
- S. Lassiter arrived and it currently in the Hall with Hall C techs working
- HMS Q1, Q2 Dipole interlocks
- HMS Dipole waterflow interlock explanation
- Currently S. Lassiter is back in counting house and ramping up magnets
- S. Lassiter arrived and it currently in the Hall with Hall C techs working
(S. Lassiter needs to put crush washers in LCW filters, so we may see a little bit of water by the HMS boogie for now, until he can put the washers next week.)
Current Run Plan
Notices in Effect for Shift Crew
Current Issues
Planned Accesses to the Hall
Planned Accelerator Configuration Changes
Special Requests
- request to go in and work on faulty HV power supply replacement (~ 30 min.), whenever there is extended down (most likely during next accelerator maintenance period)