Difference between revisions of "June 17, 2022"

From HallCWiki
Jump to navigationJump to search
Line 65: Line 65:
  
 
= Special Requests =
 
= Special Requests =
 +
*S. Lassiter needs to put crush washers in LCW filters, so we may see a little bit of water by the HMS boogie for now, until he can put the washers next week, during maintenance period
 
* request to go in and work on faulty HV power supply replacement (~ 30 min.), whenever there is extended down (most likely during next accelerator maintenance period)
 
* request to go in and work on faulty HV power supply replacement (~ 30 min.), whenever there is extended down (most likely during next accelerator maintenance period)

Revision as of 09:43, 17 June 2022

RC Meeting Information

RC Daily Meetings are at 11:00 (am) via Zoom and in person in the counting house meeting room (2nd floor)

  • Zoom remote connection information:
 Join ZoomGov Meeting
 https://jlab-org.zoomgov.com/j/1607100885?pwd=ZFBsRTFsYm5Zb0laZ0tyZXNjcEE0QT09
 Meeting ID: 160 710 0885
 Passcode: 595071
 One tap mobile
 +16692545252,,1607100885# US (San Jose)
 +16468287666,,1607100885# US (New York)
 Dial by your location
       +1 669 254 5252 US (San Jose)
       +1 646 828 7666 US (New York)
       +1 669 216 1590 US (San Jose)
       +1 551 285 1373 US
       833 568 8864 US Toll-free
 Meeting ID: 160 710 0885
 Find your local number: https://jlab-org.zoomgov.com/u/ab2CekLXgQ

Useful Links

Current Status

  • Jun 17 - Owl (today)
    • limited to 15 uA beam due to accelerator issues (Ops will work on Hall C line today to try and give us higher currents)
    • completed the detector checkout part of run plan
    • while doing +/-8 cm C12 optics run plan, HMS Dipole interlocked (~ 4:30 am )
    • SHMS optics was taken instead in the meantime
    • towards the end of Owl, HMS Q2, Q2 Dipole had all went to interlock

Current Run Plan

Notices in Effect for Shift Crew

Current Issues

Planned Accesses to the Hall

Planned Accelerator Configuration Changes

Special Requests

  • S. Lassiter needs to put crush washers in LCW filters, so we may see a little bit of water by the HMS boogie for now, until he can put the washers next week, during maintenance period
  • request to go in and work on faulty HV power supply replacement (~ 30 min.), whenever there is extended down (most likely during next accelerator maintenance period)