Difference between revisions of "June 17, 2022"

From HallCWiki
Jump to navigationJump to search
Line 73: Line 73:
 
* Need to check SHMS ROC 4 Slot 9 Channel 0 FADC for potentially loose connection, as Column 5, Row 1 block appears to have no occupancy. [https://logbooks.jlab.org/entry/4003855 SHMS Cal Occupancy]
 
* Need to check SHMS ROC 4 Slot 9 Channel 0 FADC for potentially loose connection, as Column 5, Row 1 block appears to have no occupancy. [https://logbooks.jlab.org/entry/4003855 SHMS Cal Occupancy]
 
* Xinzhan Bai request to go to restricted access to quickly swap MPD electronics out and check signals (~ 30 min.), whenever there is extended down (most likely during next accelerator maintenance period)
 
* Xinzhan Bai request to go to restricted access to quickly swap MPD electronics out and check signals (~ 30 min.), whenever there is extended down (most likely during next accelerator maintenance period)
 +
Contact: xbai@jlab.org,  cell: (434) 422-2809

Revision as of 13:20, 17 June 2022

RC Meeting Information

RC Daily Meetings are at 11:00 (am) via Zoom and in person in the counting house meeting room (2nd floor)

  • Zoom remote connection information:
 Join ZoomGov Meeting
 https://jlab-org.zoomgov.com/j/1607100885?pwd=ZFBsRTFsYm5Zb0laZ0tyZXNjcEE0QT09
 Meeting ID: 160 710 0885
 Passcode: 595071
 One tap mobile
 +16692545252,,1607100885# US (San Jose)
 +16468287666,,1607100885# US (New York)
 Dial by your location
       +1 669 254 5252 US (San Jose)
       +1 646 828 7666 US (New York)
       +1 669 216 1590 US (San Jose)
       +1 551 285 1373 US
       833 568 8864 US Toll-free
 Meeting ID: 160 710 0885
 Find your local number: https://jlab-org.zoomgov.com/u/ab2CekLXgQ

Useful Links

Current Status

  • Jun 17 - Owl (today)
    • limited to 15 uA beam due to accelerator issues (Ops will work on Hall C line today to try and give us higher currents)
    • completed the detector checkout part of run plan
    • while doing +/-8 cm C12 optics run plan, HMS Dipole interlocked (~ 4:30 am )
    • SHMS optics was taken instead in the meantime
    • towards the end of Owl, HMS Q2, Q2 Dipole had all went to interlock

Current Run Plan

  • Complete Carbon Foil +/- 8 cm (part of HMS Optics plan)
  • Complete Single Carbon Foil on HMS
  • Do Coincidence Trigger Checkout
  • Do single Heep coin setting
  • Begin production physics

Notices in Effect for Shift Crew

  • Please pro-rate ABU for 80 uA in beam time accounting. For example: 15/(max current limit) * ABU

Current Issues

Planned Accesses to the Hall

Planned Accelerator Configuration Changes

Special Requests

  • S. Lassiter needs to put crush washers in LCW filters, so we may see a little bit of water by the HMS boogie for now, until he can put the washers next week, during maintenance period HMS Dipole LCW
  • Need to check SHMS ROC 4 Slot 9 Channel 0 FADC for potentially loose connection, as Column 5, Row 1 block appears to have no occupancy. SHMS Cal Occupancy
  • Xinzhan Bai request to go to restricted access to quickly swap MPD electronics out and check signals (~ 30 min.), whenever there is extended down (most likely during next accelerator maintenance period)

Contact: xbai@jlab.org, cell: (434) 422-2809